{"title":"Mill building grounding system retrofit","authors":"D.R. Blair","doi":"10.1109/IAS.1992.244210","DOIUrl":null,"url":null,"abstract":"The author discusses an approach to retrofitting a new electrical grounding system to an existing industrial building when confidence has been lost in the integrity of the original system. He points out the near impossibility of measuring the resistance of a large grounding grid. The solution to this problem is described.<<ETX>>","PeriodicalId":110710,"journal":{"name":"Conference Record of the 1992 IEEE Industry Applications Society Annual Meeting","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of the 1992 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.1992.244210","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The author discusses an approach to retrofitting a new electrical grounding system to an existing industrial building when confidence has been lost in the integrity of the original system. He points out the near impossibility of measuring the resistance of a large grounding grid. The solution to this problem is described.<>