{"title":"Task scheduling in manufacturing systems based on an efficient branch and bound algorithm","authors":"Abolfazl Jalilvand, S. Khanmohammadi","doi":"10.1109/RAMECH.2004.1438929","DOIUrl":null,"url":null,"abstract":"The branch and bound (BB) algorithm is one of the common used methods in solving the task scheduling problems in manufacturing systems. In this paper, we introduced a new method to apply the branch and bound algorithm with a reduced memory size. By this method the running time decreases considerably. The algorithm is applied to a combinational discrete job shop scheduling system, where a Petri net is used for modeling.","PeriodicalId":252964,"journal":{"name":"IEEE Conference on Robotics, Automation and Mechatronics, 2004.","volume":"293 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Conference on Robotics, Automation and Mechatronics, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMECH.2004.1438929","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
The branch and bound (BB) algorithm is one of the common used methods in solving the task scheduling problems in manufacturing systems. In this paper, we introduced a new method to apply the branch and bound algorithm with a reduced memory size. By this method the running time decreases considerably. The algorithm is applied to a combinational discrete job shop scheduling system, where a Petri net is used for modeling.