Integrated control of centralized and renewable heat sources with peak demand compensation

W. Grega
{"title":"Integrated control of centralized and renewable heat sources with peak demand compensation","authors":"W. Grega","doi":"10.1109/ETFA.2012.6489676","DOIUrl":null,"url":null,"abstract":"The system under investigation was heat distribution network servicing a number of buildings from the central source, while some buildings are supplied from biomass boiler. The key objectives of this research were to develop an integrated system allowing control and monitoring of the operations of the sources of heating energy (including renewable energy sources) and to identify ways to optimise energy consumption. An important problem of this strategy consists in keeping peek demand of energy below the maximum power of the external energy sources. The proposed algorithm is model-based and compensates peak power energy deficiency of a building.","PeriodicalId":222799,"journal":{"name":"Proceedings of 2012 IEEE 17th International Conference on Emerging Technologies & Factory Automation (ETFA 2012)","volume":"113 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 2012 IEEE 17th International Conference on Emerging Technologies & Factory Automation (ETFA 2012)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETFA.2012.6489676","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The system under investigation was heat distribution network servicing a number of buildings from the central source, while some buildings are supplied from biomass boiler. The key objectives of this research were to develop an integrated system allowing control and monitoring of the operations of the sources of heating energy (including renewable energy sources) and to identify ways to optimise energy consumption. An important problem of this strategy consists in keeping peek demand of energy below the maximum power of the external energy sources. The proposed algorithm is model-based and compensates peak power energy deficiency of a building.
带峰值需求补偿的集中式和可再生热源综合控制
正在调查的系统是从中央热源为一些建筑物提供服务的热力分配网络,而一些建筑物则由生物质锅炉供应。这项研究的主要目标是开发一个综合系统,允许控制和监测加热能源(包括可再生能源)的运作,并确定优化能源消耗的方法。该策略的一个重要问题在于保持峰值能源需求低于外部能源的最大功率。该算法是基于模型的,可补偿建筑物的峰值能量不足。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信