{"title":"Choosing diagnostic tests to monitor stator insulation in critical motors","authors":"M. Stranges, Saeed Ul Haq, A. Vouk","doi":"10.1109/PCICON.2012.6549647","DOIUrl":null,"url":null,"abstract":"The petrochemical industry has increasing interest in condition monitoring of stator winding insulation during service. Factory acceptance specifications developed from the American Petroleum Institute (API) standards often require a PD and/or power factor tip-up (PFTU) test for brand new windings as a factory acceptance test before installation machine is installed. Petrochemical industry users often employ partial discharge (PD) detection systems for condition assessment of critical motors, but the use of the PFTU test as a periodic evaluation technique is less popular. Specialized resources are needed to perform these tests at the factory and in the field, imposing different technical demands and requiring expert data interpretation to ensure value for the end user. PD and PFTU may serve as complementary techniques and are most useful when data are trended through the machine winding service life. Both types of measurement depend on stator winding geometry, insulating materials, insulation system construction and operating environment. This paper explains the PFTU and PD tests, describes considerations for set up and execution of measurements for factory acceptance tests and installed machines, and explores technical considerations to define an appropriate test regime to monitor insulation condition. Examples of PD and PFTU test data from factory acceptance of new stator windings and on-site measurements of installed machines are discussed.","PeriodicalId":133636,"journal":{"name":"2012 Petroleum and Chemical Industry Conference (PCIC)","volume":"106 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Petroleum and Chemical Industry Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2012.6549647","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

The petrochemical industry has increasing interest in condition monitoring of stator winding insulation during service. Factory acceptance specifications developed from the American Petroleum Institute (API) standards often require a PD and/or power factor tip-up (PFTU) test for brand new windings as a factory acceptance test before installation machine is installed. Petrochemical industry users often employ partial discharge (PD) detection systems for condition assessment of critical motors, but the use of the PFTU test as a periodic evaluation technique is less popular. Specialized resources are needed to perform these tests at the factory and in the field, imposing different technical demands and requiring expert data interpretation to ensure value for the end user. PD and PFTU may serve as complementary techniques and are most useful when data are trended through the machine winding service life. Both types of measurement depend on stator winding geometry, insulating materials, insulation system construction and operating environment. This paper explains the PFTU and PD tests, describes considerations for set up and execution of measurements for factory acceptance tests and installed machines, and explores technical considerations to define an appropriate test regime to monitor insulation condition. Examples of PD and PFTU test data from factory acceptance of new stator windings and on-site measurements of installed machines are discussed.
选择诊断测试来监测关键电机的定子绝缘
石油化工行业对定子绕组绝缘在使用过程中的状态监测越来越感兴趣。根据美国石油协会(API)标准制定的工厂验收规范,在安装机器之前,通常需要对全新的绕组进行PD和/或功率因数提升(PFTU)测试,作为工厂验收测试。石化行业用户经常使用局部放电(PD)检测系统来评估关键电机的状态,但使用PFTU测试作为定期评估技术却不太流行。在工厂和现场进行这些测试需要专门的资源,提出了不同的技术要求,并需要专家数据解释,以确保最终用户的价值。PD和PFTU可以作为互补技术,当数据通过机器绕组使用寿命趋势时,它们是最有用的。这两种类型的测量取决于定子绕组的几何形状、绝缘材料、绝缘系统结构和操作环境。本文解释了PFTU和PD测试,描述了工厂验收测试和安装机器的测量设置和执行的考虑因素,并探讨了定义适当的测试制度以监测绝缘状况的技术考虑因素。讨论了新定子绕组的工厂验收和已安装机器的现场测量的PD和PFTU测试数据实例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信