{"title":"Traffic Dependent Pavement Management Algorithm","authors":"A. Bakó, K. Ambrus-Somogyi, L. Tóth","doi":"10.1109/ICCCYB.2006.305740","DOIUrl":null,"url":null,"abstract":"The Road Management Systems (and the PMS) usually do not take into consideration the future traffic change. The maintenance and rehabilitation actions and the development of the road network structure and the changing traffic structure modify the amount of the traffic on the road section. The deterioration process depends on mostly the volume of the traffic. That is why it is important to take into consideration the change of the traffic volume during the planning time horizon. In the lecture some techniques are shown which handle this problem: in multiperiod, long time model at each planning period the traffic volume change is take into consideration. In ranking models the problem could be handled and solved. In the case of one period Markov stabile model there is nothing to do. In the multiperiod model the problem could be solved also.","PeriodicalId":160588,"journal":{"name":"2006 IEEE International Conference on Computational Cybernetics","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Conference on Computational Cybernetics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCCYB.2006.305740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The Road Management Systems (and the PMS) usually do not take into consideration the future traffic change. The maintenance and rehabilitation actions and the development of the road network structure and the changing traffic structure modify the amount of the traffic on the road section. The deterioration process depends on mostly the volume of the traffic. That is why it is important to take into consideration the change of the traffic volume during the planning time horizon. In the lecture some techniques are shown which handle this problem: in multiperiod, long time model at each planning period the traffic volume change is take into consideration. In ranking models the problem could be handled and solved. In the case of one period Markov stabile model there is nothing to do. In the multiperiod model the problem could be solved also.