Relationship between Water Availability and Power Plant Performance Using Water Balance Method: Case of PT. INALUM Asahan

S. Amien, Yohanna Zelin, F. Fahmi
{"title":"Relationship between Water Availability and Power Plant Performance Using Water Balance Method: Case of PT. INALUM Asahan","authors":"S. Amien, Yohanna Zelin, F. Fahmi","doi":"10.32734/JET.V1I1.670","DOIUrl":null,"url":null,"abstract":"Hydroelectric Power Plant is a generator that uses water as a prime mover to rotate the water turbine in generating electrical energy which will then be used for industrial activity. A problem in the process of generating electrical energy is how to maximize the available water resources for optimal power generation. In this study, we will discuss the relationship of water availability with power generation performance at PLTA PT Inalum by using Water Balance method. Water Balance method is a method used to find out how much water discharge that will be issued to a dam so that output water later can be utilized to optimally generate power. From our study we found that the obtained power was generated at peak load of 560.19 MW and therefore the discharge of water issued at the dam is equal to 134.05 tons / sec. We obtained a different trend pattern every year, where in 2015 trend pattern rises, in the year 2016 there is a trend pattern that is relatively constant and in the year 2017 a pattern of downward trend occured.","PeriodicalId":117730,"journal":{"name":"Simetrikal: Journal of Engineering and Technology","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Simetrikal: Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32734/JET.V1I1.670","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Hydroelectric Power Plant is a generator that uses water as a prime mover to rotate the water turbine in generating electrical energy which will then be used for industrial activity. A problem in the process of generating electrical energy is how to maximize the available water resources for optimal power generation. In this study, we will discuss the relationship of water availability with power generation performance at PLTA PT Inalum by using Water Balance method. Water Balance method is a method used to find out how much water discharge that will be issued to a dam so that output water later can be utilized to optimally generate power. From our study we found that the obtained power was generated at peak load of 560.19 MW and therefore the discharge of water issued at the dam is equal to 134.05 tons / sec. We obtained a different trend pattern every year, where in 2015 trend pattern rises, in the year 2016 there is a trend pattern that is relatively constant and in the year 2017 a pattern of downward trend occured.
基于水平衡法的水可用性与电厂性能的关系:以阿萨罕电厂为例
水力发电厂是一种发电机,它利用水作为原动机来旋转水轮机,产生电能,然后用于工业活动。发电过程中的一个问题是如何最大限度地利用可利用水资源以实现最优发电。在本研究中,我们将使用水平衡方法讨论PLTA PT Inalum的水可用性与发电性能的关系。水量平衡法是一种计算出向大坝排水量的方法,以便以后输出的水能被最优地利用来发电。从我们的研究中,我们发现获得的电力是在峰值负荷下产生的560.19 MW,因此大坝的放水量等于134.05吨/秒。我们获得了每年不同的趋势模式,其中2015年趋势模式上升,2016年趋势模式相对恒定,2017年趋势模式下降。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信