C-17 intermediate level automatic test system for avionics maintenance

J. Allen, C. A. McNeil
{"title":"C-17 intermediate level automatic test system for avionics maintenance","authors":"J. Allen, C. A. McNeil","doi":"10.1109/AUTEST.1994.381571","DOIUrl":null,"url":null,"abstract":"Significant challenges exist when automatic test systems are developed concurrently with avionics to support initial aircraft deployment. The C-17 Globemaster III Intermediate Level Avionics Maintenance System meets those challenges. The C-17A \"support by capability\" program requirement is a unique contractual environment for Test Program Set development. Process based management coupled with low risk development strategies provided a path for on-time Test Program Set deployment. The strategy of using government inventory B-1B Automatic Test Equipment contributed to concurrent Test Program Set operations with the very first day of the C-17A aircraft deployment. This industry \"first\" is not without some valuable lessons learned.<<ETX>>","PeriodicalId":308840,"journal":{"name":"Proceedings of AUTOTESTCON '94","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of AUTOTESTCON '94","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.1994.381571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Significant challenges exist when automatic test systems are developed concurrently with avionics to support initial aircraft deployment. The C-17 Globemaster III Intermediate Level Avionics Maintenance System meets those challenges. The C-17A "support by capability" program requirement is a unique contractual environment for Test Program Set development. Process based management coupled with low risk development strategies provided a path for on-time Test Program Set deployment. The strategy of using government inventory B-1B Automatic Test Equipment contributed to concurrent Test Program Set operations with the very first day of the C-17A aircraft deployment. This industry "first" is not without some valuable lessons learned.<>
C-17航空电子设备维修中级自动测试系统
当自动测试系统与航空电子设备同时开发以支持初始飞机部署时,存在重大挑战。C-17环球霸王III中级航空电子设备维护系统可以应对这些挑战。C-17A“能力支持”项目要求是测试项目集开发的独特合同环境。基于过程的管理与低风险的开发策略相结合,为及时部署测试程序集提供了一条途径。使用政府库存B-1B自动测试设备的策略有助于在C-17A飞机部署的第一天同时进行测试程序集操作。这个行业的“第一”并非没有吸取一些宝贵的经验教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信