Long duration simulations of railway AC Electrified lines

M. Ceraolo
{"title":"Long duration simulations of railway AC Electrified lines","authors":"M. Ceraolo","doi":"10.23919/AEIT.2018.8577344","DOIUrl":null,"url":null,"abstract":"Simulation models must have a level of detail congruent with the prescribed goals and considered time span. Electrified railway lines require simulating trains during their typical trips, with acceleration and braking transients lasting at least several seconds or some minutes;. On the other hand, AC lines have quantities (voltages, currents) which vary much faster, e.g. at 50 or 60 Hz. This paper discusses how to model railway electric supply networks with a complexity adequate for long-run simulations, while still having good precision and details on the results. In particular, it discusses the usage of hybrid models combining the use of complex impedances for the supply system with dynamic models of trains. It also discusses the use of supply line models having a reduced number of conductors to make them smaller and faster to simulate, without loss of precision. The proposed techniques are implemented in models written in the Modelica simulation language, and results are shown, which compare precision and computational efficiency of models using the proposed technique with others built in a more conventional time-domain way.","PeriodicalId":413577,"journal":{"name":"2018 AEIT International Annual Conference","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 AEIT International Annual Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT.2018.8577344","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Simulation models must have a level of detail congruent with the prescribed goals and considered time span. Electrified railway lines require simulating trains during their typical trips, with acceleration and braking transients lasting at least several seconds or some minutes;. On the other hand, AC lines have quantities (voltages, currents) which vary much faster, e.g. at 50 or 60 Hz. This paper discusses how to model railway electric supply networks with a complexity adequate for long-run simulations, while still having good precision and details on the results. In particular, it discusses the usage of hybrid models combining the use of complex impedances for the supply system with dynamic models of trains. It also discusses the use of supply line models having a reduced number of conductors to make them smaller and faster to simulate, without loss of precision. The proposed techniques are implemented in models written in the Modelica simulation language, and results are shown, which compare precision and computational efficiency of models using the proposed technique with others built in a more conventional time-domain way.
铁路交流电气化线路的长时间模拟
仿真模型必须具有与规定的目标和考虑的时间跨度相一致的详细程度。电气化铁路线需要模拟火车的典型行程,加速和制动瞬态至少持续几秒钟或几分钟;另一方面,交流线路的数量(电压、电流)变化得更快,例如在50或60赫兹。本文讨论了如何对铁路供电网络进行建模,使其具有足够的复杂性来进行长期仿真,同时仍然具有良好的精度和详细的结果。特别地,它讨论了混合模型的使用结合使用的复杂阻抗的供应系统与列车的动态模型。它还讨论了使用具有减少导体数量的供应线模型,使其更小,更快地模拟,而不会失去精度。所提出的技术在用Modelica仿真语言编写的模型中实现,并显示了使用所提出的技术与以更传统的时域方式构建的模型的精度和计算效率的比较结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信