Sizing hybrid power plants under round-the-clock tender compliance in India

Elisabeth Andreae, T. V. Jensen, D. E. M. Bondy, K. Heussen
{"title":"Sizing hybrid power plants under round-the-clock tender compliance in India","authors":"Elisabeth Andreae, T. V. Jensen, D. E. M. Bondy, K. Heussen","doi":"10.1109/REST54687.2022.10022596","DOIUrl":null,"url":null,"abstract":"India aims to quadruple its renewable electricity capacity by 2030, using auction-based renewable power tenders as a mechanism to achieve that goal. We formulate an optimization problem to optimise a power producer's plant sizing for this tariff-based bidding process. The outcome is an investment optimisation model for a hybrid power system that complies with the specific Round-the-Clock tender criteria. Results indicate that the invitation to tender incentivises investment in renewable power instead of conventional thermal coal power, increasing the renewable power capacity share by a factor of 1.5 when flexibility is added to the firm capacity conditions. Further, the optimal investment outcome shows a critical dependence on the specific tender parameters.","PeriodicalId":187362,"journal":{"name":"2022 International Conference on Renewable Energies and Smart Technologies (REST)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 International Conference on Renewable Energies and Smart Technologies (REST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REST54687.2022.10022596","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

India aims to quadruple its renewable electricity capacity by 2030, using auction-based renewable power tenders as a mechanism to achieve that goal. We formulate an optimization problem to optimise a power producer's plant sizing for this tariff-based bidding process. The outcome is an investment optimisation model for a hybrid power system that complies with the specific Round-the-Clock tender criteria. Results indicate that the invitation to tender incentivises investment in renewable power instead of conventional thermal coal power, increasing the renewable power capacity share by a factor of 1.5 when flexibility is added to the firm capacity conditions. Further, the optimal investment outcome shows a critical dependence on the specific tender parameters.
在24小时招标合规的情况下,印度的混合动力发电厂规模
印度的目标是到2030年将其可再生能源发电能力翻两番,利用以拍卖为基础的可再生能源招标机制来实现这一目标。我们制定了一个优化问题,以优化电力生产商的工厂规模,为这个基于电价的招标过程。其结果是混合电力系统的投资优化模型,该模型符合特定的24小时招标标准。结果表明,招标激励了可再生能源而不是传统的动力煤发电的投资,当企业容量条件增加灵活性时,可再生能源的容量份额增加了1.5倍。此外,最优投资结果显示出对特定投标参数的关键依赖。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书