Challenges in Next Generation Mixed-Signal IC Production Testing

S. Cherubal
{"title":"Challenges in Next Generation Mixed-Signal IC Production Testing","authors":"S. Cherubal","doi":"10.1109/ATS.2005.34","DOIUrl":null,"url":null,"abstract":"This talk will introduce the general challenges faced in high volume production test, and describe how they apply to the testing of the next generation mixed signal ASICs. In general, a test engineer has 4 things he wants to optimize: (1) Test cost, (2) Yield, (3) Time to volume/Time to Market, and (4) Defective-Parts-Per- Million (DPPM) of shipped devices. The relative importance of each of these goals depends on market segment, maturity of the product and a host of other factors. Test cost is minimized by optimizing test time, and by choosing low-cost test platforms. There are also other factors involved in test cost, including burnin requirements and the need for testing at multiple temperatures. Optimization of yield and DPPM often involves improving test reliability to minimize guardbands, as well as ensuring high test coverage. Timeto- volume constraints, often imposed by market requirements, put severe pressure on test engineers to develop reliable low-cost test solutions in minimum time.","PeriodicalId":373563,"journal":{"name":"14th Asian Test Symposium (ATS'05)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"14th Asian Test Symposium (ATS'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ATS.2005.34","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

This talk will introduce the general challenges faced in high volume production test, and describe how they apply to the testing of the next generation mixed signal ASICs. In general, a test engineer has 4 things he wants to optimize: (1) Test cost, (2) Yield, (3) Time to volume/Time to Market, and (4) Defective-Parts-Per- Million (DPPM) of shipped devices. The relative importance of each of these goals depends on market segment, maturity of the product and a host of other factors. Test cost is minimized by optimizing test time, and by choosing low-cost test platforms. There are also other factors involved in test cost, including burnin requirements and the need for testing at multiple temperatures. Optimization of yield and DPPM often involves improving test reliability to minimize guardbands, as well as ensuring high test coverage. Timeto- volume constraints, often imposed by market requirements, put severe pressure on test engineers to develop reliable low-cost test solutions in minimum time.
下一代混合信号集成电路生产测试的挑战
本讲座将介绍大批量生产测试中面临的一般挑战,并描述它们如何应用于下一代混合信号asic的测试。一般来说,测试工程师有4个他想优化的东西:(1)测试成本,(2)良率,(3)批量时间/上市时间,以及(4)出货设备的百万分率(DPPM)。这些目标的相对重要性取决于市场细分、产品的成熟度和许多其他因素。通过优化测试时间和选择低成本的测试平台来最小化测试成本。测试成本还涉及其他因素,包括燃烧要求和在多个温度下进行测试的需要。良率和DPPM的优化通常包括提高测试可靠性以最小化保护带,以及确保高测试覆盖率。通常由市场需求造成的时间对体积的限制给测试工程师带来了巨大的压力,要求他们在最短的时间内开发出可靠的低成本测试解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信