The Ocean Drilling Program II: JOIDES Resolution - Scientific drillship of the 80's

G. Foss
{"title":"The Ocean Drilling Program II: JOIDES Resolution - Scientific drillship of the 80's","authors":"G. Foss","doi":"10.1109/OCEANS.1985.1160101","DOIUrl":null,"url":null,"abstract":"The Ocean Drilling Program, which began operations in January, 1985, required a drilling vessel with increased operational capabilities to achieve its ambitiously redefined objectives in sub-seafloor research. The vessel selected would be called upon to continue and exceed the remarkable accomplishments of Glomar Challanger and the Deep Sea Drilling Project. During 1984, the Sedco/BP 471 drillship was selected for that mission and was converted to a scientific drilling/coring vessel. In addition to a more than twofold increase in scientific laboratory and berthing accommodations in comparison to the Challanger, the following operational upgrades have been incorporated: 1. Increased drill string capability to 30,000 feet (9144 meters) by means of a tapered drill string with additional racking capacity. 2. Increased available power for dynamic positioning, pipehandling and increased transit speed. 3. Riser handling capability. 4. State-of-the-art drilling systems, including in-line heave compensator, electric top drive, \"Iron Roughneck\" and dual-drum coring winch. 5. New downhole systems, including high resolution sonar and television capabilities for reentry, and the use of downhole motors for coring and bare-rock spudding. The Sedco vessel, unofficially rechristened \"JOIDES Resolution\", has now completed several months of ODP operations with only minimal \"teething problems\". In nearly all respects the desired capabilities have been achieved or exceeded. This paper describes the improvements and discusses planned additional upgrading of capabilities.","PeriodicalId":437366,"journal":{"name":"OCEANS '85 - Ocean Engineering and the Environment","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"OCEANS '85 - Ocean Engineering and the Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OCEANS.1985.1160101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

The Ocean Drilling Program, which began operations in January, 1985, required a drilling vessel with increased operational capabilities to achieve its ambitiously redefined objectives in sub-seafloor research. The vessel selected would be called upon to continue and exceed the remarkable accomplishments of Glomar Challanger and the Deep Sea Drilling Project. During 1984, the Sedco/BP 471 drillship was selected for that mission and was converted to a scientific drilling/coring vessel. In addition to a more than twofold increase in scientific laboratory and berthing accommodations in comparison to the Challanger, the following operational upgrades have been incorporated: 1. Increased drill string capability to 30,000 feet (9144 meters) by means of a tapered drill string with additional racking capacity. 2. Increased available power for dynamic positioning, pipehandling and increased transit speed. 3. Riser handling capability. 4. State-of-the-art drilling systems, including in-line heave compensator, electric top drive, "Iron Roughneck" and dual-drum coring winch. 5. New downhole systems, including high resolution sonar and television capabilities for reentry, and the use of downhole motors for coring and bare-rock spudding. The Sedco vessel, unofficially rechristened "JOIDES Resolution", has now completed several months of ODP operations with only minimal "teething problems". In nearly all respects the desired capabilities have been achieved or exceeded. This paper describes the improvements and discusses planned additional upgrading of capabilities.
海洋钻探计划II: JOIDES决议- 80年代的科学钻探船
海洋钻探计划于1985年1月开始实施,需要一艘作业能力更强的钻井船,以实现其在海底研究中雄心勃勃的重新定义的目标。被选中的船只将被要求继续并超越Glomar challenger和深海钻探项目的卓越成就。在1984年,Sedco/BP 471钻井船被选中执行该任务,并被改装为科学钻井/取心船。除了科学实验室和停泊设施比挑战者号增加两倍以上外,还包括以下操作升级:1。通过锥形钻柱和额外的支架容量,将钻柱的钻深提高到30000英尺(9144米)。2. 增加了动态定位、管道处理和运输速度的可用功率。3.立管处理能力。4. 最先进的钻井系统,包括直列式升沉补偿器、电动顶驱、“铁钻工”和双滚筒取心绞车。5. 新型井下系统,包括用于再入的高分辨率声纳和电视功能,以及用于取心和裸岩钻井的井下马达。Sedco船,非正式地重新命名为“JOIDES Resolution”,现在已经完成了几个月的ODP作业,只有最小的“初期问题”。几乎在所有方面都达到或超过了预期的能力。本文描述了改进,并讨论了计划中的其他功能升级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信