Analysis Of Comparison Of Cost And Time Implementation Of Road Projects Using Methods Time Cost Trade Off

S. Rahayu, M. I. Setiawan
{"title":"Analysis Of Comparison Of Cost And Time Implementation Of Road Projects Using Methods Time Cost Trade Off","authors":"S. Rahayu, M. I. Setiawan","doi":"10.29138/prd.v2i1.132","DOIUrl":null,"url":null,"abstract":"Maintenance project Napoleon road “Rumah Apung” in bangsring village of Wongsorejo subdistrict Banyuwangi. In the implementation of this project there were delays in some jobs, namely ordinary excavation, pavement exavation is paved without cold milling machine, and fc’ 25 Mpa quality concrete.                                                                                                So that it can affect other activities. One way to anticipate delays is by accelerating using the Time Cost Trade Off method, through alternative hours of work (overtime) for 3 hours on the first 3 days of work and the addition of labor for the first 3 days of work commenced. \nThe result of the analysis of the two alternatives in this study obtained results for ordinary excavations with the addition of working hours (overtime) for 3 hours in the first three days of work started to obtain project cost efficiency of Rp. 5.537.232,- from the normal cost of Rp. 6.523.171,20,- compared to the addition of labor. Whereas paved pavement excavations without cold milling machines have a 9 day efficiency period from the normal duration of 12 working days and a cost efficiency of Rp. 2.412.000,- from the normal cost of Rp. 3.216.000,- compared to the additional hours of overtime work. For fc’ 25 Mpa quality concrete work, efficiency at normal project costs and time is 12 working days with normal costs Rp. 3.040.950,816,- in addition to working hours (overtime).","PeriodicalId":386863,"journal":{"name":"Journal of World Conference (JWC)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of World Conference (JWC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/prd.v2i1.132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Maintenance project Napoleon road “Rumah Apung” in bangsring village of Wongsorejo subdistrict Banyuwangi. In the implementation of this project there were delays in some jobs, namely ordinary excavation, pavement exavation is paved without cold milling machine, and fc’ 25 Mpa quality concrete.                                                                                                So that it can affect other activities. One way to anticipate delays is by accelerating using the Time Cost Trade Off method, through alternative hours of work (overtime) for 3 hours on the first 3 days of work and the addition of labor for the first 3 days of work commenced. The result of the analysis of the two alternatives in this study obtained results for ordinary excavations with the addition of working hours (overtime) for 3 hours in the first three days of work started to obtain project cost efficiency of Rp. 5.537.232,- from the normal cost of Rp. 6.523.171,20,- compared to the addition of labor. Whereas paved pavement excavations without cold milling machines have a 9 day efficiency period from the normal duration of 12 working days and a cost efficiency of Rp. 2.412.000,- from the normal cost of Rp. 3.216.000,- compared to the additional hours of overtime work. For fc’ 25 Mpa quality concrete work, efficiency at normal project costs and time is 12 working days with normal costs Rp. 3.040.950,816,- in addition to working hours (overtime).
运用时间成本权衡法对公路工程成本与时间实施的比较分析
Banyuwangi Wongsorejo街道bangspring村的拿破仑路“Rumah Apung”维修项目。在实施这个项目有一些工作延迟,即普通的开挖,路面exavation铺没有寒冷的铣床,和fc 25 Mpa混凝土质量 .                                                                                                从而影响到其他活动。预测延迟的一种方法是加速使用时间成本权衡方法,通过在前3天工作的3小时的替代工作时间(加班)和前3天工作开始的额外劳动力。本研究对两种替代方案的分析结果得出,对于普通开挖,在开始工作的前三天增加工作时间(加班)3小时,与增加劳动力相比,获得的项目成本效率为Rp. 5.537.232,-正常成本为Rp. 6.523.171,20,-。然而,与额外的加班时间相比,没有冷铣床的铺装路面挖掘有9天的效率期,而正常工期为12个工作日,成本效率为241.2万卢比,而正常成本为321.6万卢比。对于fc ' 25 Mpa质量混凝土工程,在正常项目成本和时间下的效率为12个工作日,正常成本Rp. 3.040.950,816,-除了工作时间(加班)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信