Market based transmission expansion planning: stakeholders' desires

M. O. Buygi, G. Balzer, H. Shanechi, M. Shahidehpour
{"title":"Market based transmission expansion planning: stakeholders' desires","authors":"M. O. Buygi, G. Balzer, H. Shanechi, M. Shahidehpour","doi":"10.1109/DRPT.2004.1337998","DOIUrl":null,"url":null,"abstract":"In unbundled power markets, stakeholders have different interests and expectations from performance and expansion of the system. This paper presents a new market based approach for transmission expansion planning with consideration given to the stakeholders' desires using fuzzy decision making. Five groups of stakeholders; power producers, demand customers, system operator, network owners, and regulator, are considered. Competition, reliability, flexibility, network charge and environmental impacts are evaluated from the viewpoint of different stakeholders for selecting the final plan. Some market based criteria are presented to measure stakeholders' desires. The approach is applied to IEEE 30 bus network.","PeriodicalId":427228,"journal":{"name":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"33","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2004.1337998","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 33

Abstract

In unbundled power markets, stakeholders have different interests and expectations from performance and expansion of the system. This paper presents a new market based approach for transmission expansion planning with consideration given to the stakeholders' desires using fuzzy decision making. Five groups of stakeholders; power producers, demand customers, system operator, network owners, and regulator, are considered. Competition, reliability, flexibility, network charge and environmental impacts are evaluated from the viewpoint of different stakeholders for selecting the final plan. Some market based criteria are presented to measure stakeholders' desires. The approach is applied to IEEE 30 bus network.
基于市场的输电扩张规划:利益相关者的愿望
在非捆绑电力市场中,利益相关者对系统的绩效和扩张有着不同的利益和期望。本文利用模糊决策方法,提出了一种基于市场的考虑利益相关者意愿的输电扩建规划新方法。五组利益相关者;电力生产商、需求客户、系统运营商、网络所有者和监管机构都被考虑在内。从不同利益相关者的角度评估竞争、可靠性、灵活性、网络费用和环境影响,以选择最终方案。提出了一些基于市场的标准来衡量利益相关者的愿望。该方法已应用于ieee30总线网络。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信