Cost savings on mine dewatering pumps by reducing preparation- and comeback loads

C. Cilliers, L. F. van der Zee, M. Kleingeld
{"title":"Cost savings on mine dewatering pumps by reducing preparation- and comeback loads","authors":"C. Cilliers, L. F. van der Zee, M. Kleingeld","doi":"10.1109/ICUE.2014.6904166","DOIUrl":null,"url":null,"abstract":"With the introduction of a time-of-use (TOU) tariff structure by Eskom, the implementation of projects that shift load from peak TOU times to times of the day when electrical energy is less expensive has increased. To enable load shifting on mine dewatering pumps, preparation before and recovery after peak TOU is needed for effective results. This induces a preparation- and comeback load in the standard TOU. With an annual increase in TOU tariffs and the rate of increase of standard TOU being greater than that of the peak TOU, a reduction in electrical energy consumption before and after peak TOU is needed. To enable this, a step-by-step control technique was developed to promote the shifting of load from standard-to off-peak TOU, while still realising a full load shift from peak TOU. This technique entails dynamic control ranges of underground dam levels as opposed to the conventional constant control range method. Control range upper and lower bounds were optimised through the formulation and application of equations taking into account various system parameters. Two case studies were used to test the developed technique. Results indicated significant additional financial savings when compared to conventional control methods. Additional savings of R 1,096,056.65 and R 579,394.27 per annum were respectively achieved for both case studies.","PeriodicalId":149169,"journal":{"name":"2014 International Conference on the Eleventh industrial and Commercial Use of Energy","volume":"101 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 International Conference on the Eleventh industrial and Commercial Use of Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICUE.2014.6904166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 25

Abstract

With the introduction of a time-of-use (TOU) tariff structure by Eskom, the implementation of projects that shift load from peak TOU times to times of the day when electrical energy is less expensive has increased. To enable load shifting on mine dewatering pumps, preparation before and recovery after peak TOU is needed for effective results. This induces a preparation- and comeback load in the standard TOU. With an annual increase in TOU tariffs and the rate of increase of standard TOU being greater than that of the peak TOU, a reduction in electrical energy consumption before and after peak TOU is needed. To enable this, a step-by-step control technique was developed to promote the shifting of load from standard-to off-peak TOU, while still realising a full load shift from peak TOU. This technique entails dynamic control ranges of underground dam levels as opposed to the conventional constant control range method. Control range upper and lower bounds were optimised through the formulation and application of equations taking into account various system parameters. Two case studies were used to test the developed technique. Results indicated significant additional financial savings when compared to conventional control methods. Additional savings of R 1,096,056.65 and R 579,394.27 per annum were respectively achieved for both case studies.
通过减少准备和返回负荷来节省矿井脱水泵的成本
随着Eskom引入分时电价(TOU)结构,将负荷从峰值TOU时间转移到一天中电力价格较低的时段的项目的实施有所增加。为了实现矿井脱水泵的负荷转移,需要进行调峰前的准备和调峰后的回收,才能取得有效的效果。这在标准TOU中引起了准备和返回负载。随着分时电价的逐年上涨,标准分时电价的涨幅大于峰值分时电价的涨幅,需要在分时电价峰值前后减少电能消耗。为了实现这一点,开发了一种逐步控制技术,以促进负荷从标准TOU转移到非峰值TOU,同时仍然实现从峰值TOU的全负荷转移。与传统的恒定控制范围方法相反,该技术需要地下坝水位的动态控制范围。考虑到系统的各种参数,通过方程的制定和应用,优化控制范围的上下界。两个案例研究被用来测试开发的技术。结果表明,与传统控制方法相比,可显著节省额外的资金。这两个案例研究每年分别额外节省1,096,056.65卢比和579,394.27卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书