Two-stage robust facility location problem with multiplicative uncertainties and disruptions

Chun Peng, Jinlin Li, Shanshan Wang
{"title":"Two-stage robust facility location problem with multiplicative uncertainties and disruptions","authors":"Chun Peng, Jinlin Li, Shanshan Wang","doi":"10.1109/ICSSSM.2017.7996131","DOIUrl":null,"url":null,"abstract":"In this paper, we integrate two independent multiplicative uncertainties (uncertain demand and cost) and facility disruptions together, introduce budget uncertainty set to capture uncertain parameters. Based on the underlying deterministic model, we propose a two-stage robust facility location model, incorporating facility disruptions in recourse stage, which is an nonlinear problem resulted by two multiplicative uncertain parameters. Then, using the recent advances in robust optimization, we reformulate the proposed model as a tractable mixed integer linear programming. Finally, it is applied to a practical study for emergency supply network in Northwest Sichuan, and some managerial insights are drawn.","PeriodicalId":239892,"journal":{"name":"2017 International Conference on Service Systems and Service Management","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Service Systems and Service Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2017.7996131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In this paper, we integrate two independent multiplicative uncertainties (uncertain demand and cost) and facility disruptions together, introduce budget uncertainty set to capture uncertain parameters. Based on the underlying deterministic model, we propose a two-stage robust facility location model, incorporating facility disruptions in recourse stage, which is an nonlinear problem resulted by two multiplicative uncertain parameters. Then, using the recent advances in robust optimization, we reformulate the proposed model as a tractable mixed integer linear programming. Finally, it is applied to a practical study for emergency supply network in Northwest Sichuan, and some managerial insights are drawn.
具有多重不确定性和中断的两阶段鲁棒设施选址问题
本文将两个独立的乘法不确定性(需求不确定性和成本不确定性)和设施中断整合在一起,引入预算不确定性集来捕获不确定性参数。在基础确定性模型的基础上,提出了一个两阶段鲁棒设施选址模型,该模型考虑了资源阶段的设施中断问题,这是一个由两个不确定参数乘法引起的非线性问题。然后,利用鲁棒优化的最新进展,我们将所提出的模型重新表述为可处理的混合整数线性规划。最后,将其应用于川西北地区应急供电网络的实际研究,得出一些管理启示。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信