{"title":"Short-term Energy Recovery Control for Virtual Inertia Provision by Renewable Energy Sources","authors":"J. Mauricio, Kyriaki-Nefeli D. Malamaki, J. Maza-Ortega, G. Kryonidis, M. Barragán-Villarejo, S. Gkavanoudis, C. Demoulias","doi":"10.1109/ISIE45552.2021.9576213","DOIUrl":null,"url":null,"abstract":"The proliferation of Converter-Interfaced Renewable Energy Sources (CIRES), which are inertia-less, and the gradual decommissioning of synchronous generation have posed several challenges to the electric power system. This has motivated a complete a shift in the CIRES design and its corresponding control philosophy. Integrating Energy Storage Systems (ESS) within CIRES enables the implementation of different operating modes allowing them to provide ancillary services (AS) in a similar way to the synchronous generation. In order to tackle with those short-term response AS, such as virtual inertia, fast ESS (FESS) solutions with high power-to-energy ratio, particularly flywheels and supercapacitors, are preferred. In spite of several control algorithms have been proposed to provide such fast AS, very little research effort has been paid on the proper FESS energy recovery after the AS provision. This task is particularly challenging, since supercapacitors must be operated at a certain state of charge to guarantee that the required AS can be provided within its operational limits. This paper aims to fill this gap by proposing a new energy recovery control scheme for supercapacitors after the provision of short-term AS, such as virtual inertia. The proposed control is validated via simulations which clearly highlights its adequate performance.","PeriodicalId":365956,"journal":{"name":"2021 IEEE 30th International Symposium on Industrial Electronics (ISIE)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE 30th International Symposium on Industrial Electronics (ISIE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIE45552.2021.9576213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The proliferation of Converter-Interfaced Renewable Energy Sources (CIRES), which are inertia-less, and the gradual decommissioning of synchronous generation have posed several challenges to the electric power system. This has motivated a complete a shift in the CIRES design and its corresponding control philosophy. Integrating Energy Storage Systems (ESS) within CIRES enables the implementation of different operating modes allowing them to provide ancillary services (AS) in a similar way to the synchronous generation. In order to tackle with those short-term response AS, such as virtual inertia, fast ESS (FESS) solutions with high power-to-energy ratio, particularly flywheels and supercapacitors, are preferred. In spite of several control algorithms have been proposed to provide such fast AS, very little research effort has been paid on the proper FESS energy recovery after the AS provision. This task is particularly challenging, since supercapacitors must be operated at a certain state of charge to guarantee that the required AS can be provided within its operational limits. This paper aims to fill this gap by proposing a new energy recovery control scheme for supercapacitors after the provision of short-term AS, such as virtual inertia. The proposed control is validated via simulations which clearly highlights its adequate performance.
可再生能源虚拟惯性供给的短期能量回收控制
无惯性的变流器接口可再生能源(CIRES)的激增以及同步发电的逐步退役给电力系统带来了一些挑战。这激发了CIRES设计及其相应控制理念的彻底转变。在CIRES中集成储能系统(ESS)可以实现不同的运行模式,使它们能够以类似于同步发电的方式提供辅助服务(AS)。为了解决这些短期响应AS,如虚拟惯性,具有高功率-能量比的快速ESS (FESS)解决方案,特别是飞轮和超级电容器是首选。尽管已经提出了几种控制算法来提供如此快速的AS,但在AS提供后适当的FESS能量回收方面的研究很少。这项任务尤其具有挑战性,因为超级电容器必须在一定的充电状态下工作,以保证在其工作限制内提供所需的AS。本文旨在填补这一差距提出了一个新的超级电容器能量回收控制方案后,提供短期,比如虚拟惯性。通过仿真验证了所提出的控制方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信