Feasibility of Pumped Hydroelectric Storage Within Existing USACE Facilities: a Methodological Approach

Kyle J. Kass, F. T. Davidson
{"title":"Feasibility of Pumped Hydroelectric Storage Within Existing USACE Facilities: a Methodological Approach","authors":"Kyle J. Kass, F. T. Davidson","doi":"10.1115/imece2021-69416","DOIUrl":null,"url":null,"abstract":"\n Variable, renewable energy (VRE) generation such as solar power has seen a rapid increase in usage over the past decades. These power generation sources offer benefits due to their low marginal costs and reduced emissions. However, VRE assets are not dispatchable, which can result in a mismatch of the electric supply and demand curves. Pumped-storage hydropower (PSH) seeks to solve this by pumping water uphill during times of excess energy production and releasing the water back downhill through turbines during energy shortages, thus serving as a rechargeable battery. Creating new PSH systems, however, requires a large amount of capital and suitable locations. The United States Army Corps. of Engineers (USACE) is the largest producer of hydroelectric power within the United States, and as such, may have favorable sites for the addition of PSH. This study seeks to develop a method for evaluating these existing hydroelectric facilities using techno-economic methods to assess the potential for adding PSH. Each USACE facility was evaluated based on site specific characteristics from previously unpublished data to estimate the power generation and energy storage potential. The temporal nature of local wholesale electricity prices was accounted for to help estimate the financial feasibility of varying locations. Sensitivity analysis was performed to highlight how the method would identify the viability of facilities with different operational conditions. The methodologies detailed in this study will inform decision-making processes, and help enable a sustainable electric grid.","PeriodicalId":238134,"journal":{"name":"Volume 8B: Energy","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 8B: Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/imece2021-69416","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Variable, renewable energy (VRE) generation such as solar power has seen a rapid increase in usage over the past decades. These power generation sources offer benefits due to their low marginal costs and reduced emissions. However, VRE assets are not dispatchable, which can result in a mismatch of the electric supply and demand curves. Pumped-storage hydropower (PSH) seeks to solve this by pumping water uphill during times of excess energy production and releasing the water back downhill through turbines during energy shortages, thus serving as a rechargeable battery. Creating new PSH systems, however, requires a large amount of capital and suitable locations. The United States Army Corps. of Engineers (USACE) is the largest producer of hydroelectric power within the United States, and as such, may have favorable sites for the addition of PSH. This study seeks to develop a method for evaluating these existing hydroelectric facilities using techno-economic methods to assess the potential for adding PSH. Each USACE facility was evaluated based on site specific characteristics from previously unpublished data to estimate the power generation and energy storage potential. The temporal nature of local wholesale electricity prices was accounted for to help estimate the financial feasibility of varying locations. Sensitivity analysis was performed to highlight how the method would identify the viability of facilities with different operational conditions. The methodologies detailed in this study will inform decision-making processes, and help enable a sustainable electric grid.
在现有USACE设施内抽水蓄能的可行性:方法方法
在过去几十年里,太阳能等可变可再生能源(VRE)发电的使用量迅速增加。这些发电源由于其低边际成本和减少排放而具有优势。然而,VRE资产不可调度,这可能导致电力供应和需求曲线的不匹配。抽水蓄能水电(PSH)试图解决这个问题,在能源生产过剩时将水抽水到山上,在能源短缺时通过涡轮机将水释放回山下,从而充当可充电电池。然而,创建新的PSH系统需要大量资金和合适的地点。美国陆军。美国工程师协会(USACE)是美国最大的水力发电生产商,因此,可能有有利的地点增加PSH。本研究旨在开发一种方法,利用技术经济方法评价这些现有水电设施,以评估增加PSH的潜力。每个USACE设施都是根据以前未公布的数据进行评估的,以估计发电和储能潜力。考虑到当地批发电价的时间性质,以帮助估计不同地点的财务可行性。进行了敏感性分析,以突出该方法如何识别不同操作条件下设施的可行性。本研究中详细介绍的方法将为决策过程提供信息,并有助于实现可持续电网。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信