Simultaneous Gate Sizing and Skew Scheduling to Statistical Yield Improvement

Minoo Mirsaeedi, M. S. Zamani, Mehdi Saeedi
{"title":"Simultaneous Gate Sizing and Skew Scheduling to Statistical Yield Improvement","authors":"Minoo Mirsaeedi, M. S. Zamani, Mehdi Saeedi","doi":"10.1109/ISVLSI.2008.69","DOIUrl":null,"url":null,"abstract":"It has been shown that several process parameters encounter variation in the DSM era. Consequently, several techniques, such as statistical gate sizing and clock skew scheduling, have been proposed to enhance yield loss. In this work, we propose an integrated statistical framework for gate sizing and skew scheduling in order to minimize yield loss and area cost. While traditional separate methods lead to very sub-optimal solutions in some cases, this paper shows that by considering the two problems in one stage, less yield loss and smaller area is achievable Experiments demonstrate that on average 25% area cost reduction can be obtained by the unified combinational-sequential optimization compared to the conventional one.","PeriodicalId":289357,"journal":{"name":"2008 IEEE Computer Society Annual Symposium on VLSI","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE Computer Society Annual Symposium on VLSI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISVLSI.2008.69","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

It has been shown that several process parameters encounter variation in the DSM era. Consequently, several techniques, such as statistical gate sizing and clock skew scheduling, have been proposed to enhance yield loss. In this work, we propose an integrated statistical framework for gate sizing and skew scheduling in order to minimize yield loss and area cost. While traditional separate methods lead to very sub-optimal solutions in some cases, this paper shows that by considering the two problems in one stage, less yield loss and smaller area is achievable Experiments demonstrate that on average 25% area cost reduction can be obtained by the unified combinational-sequential optimization compared to the conventional one.
同时进行浇口尺寸和倾斜调度以提高统计成品率
研究表明,在DSM时代,一些工艺参数会发生变化。因此,提出了几种技术,如统计门尺寸和时钟偏差调度,以增加良率损失。在这项工作中,我们提出了一个集成的浇口尺寸和倾斜调度的统计框架,以最大限度地减少产量损失和面积成本。虽然传统的分离方法在某些情况下会导致非常次优的解,但本文表明,在一个阶段考虑这两个问题,可以实现更小的产量损失和更小的面积。实验表明,通过统一的组合-顺序优化,与传统的组合-顺序优化相比,平均可以减少25%的面积成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书