PROJECT PLANNING PROYEK PEMBANGUNAN APARTEMEN CAMBIO LOFTS TANGERANG SELATAN

Mohammad Dzikril Akbar, Suhariyanto Suhariyanto, Agus Sugiarto
{"title":"PROJECT PLANNING PROYEK PEMBANGUNAN APARTEMEN CAMBIO LOFTS TANGERANG SELATAN","authors":"Mohammad Dzikril Akbar, Suhariyanto Suhariyanto, Agus Sugiarto","doi":"10.55404/jos-mrk.2021.02.03.227-232","DOIUrl":null,"url":null,"abstract":"The Cambio Lofts Apartment Construction Project in South Tangerang is a project owned by PT Graha Indah Semesta which was carried out by PT. Brantas Abipraya (Persero) with a contract value of IDR 640,000,000 for 1369 calendar days. project planning Properis needed to realize the project on time, cost, and quality. For this reason, it is necessary to prepare a project planning that includes organizational structure, site layout, strategy and implementation methods, quality and K3 plans, scheduling, and costs. The data needed in the preparation of Project Planning are project drawings, work plans and requirements, and basic unit prices. In preparing the work schedule using the program Microsoft Project 2019 and project costs using the program. Microsoft Excel 2019 The results of the preparation are, using a functional organizational structure, the strategy is to use two tower cranes and divide work zones, the quality of work is carried out by testing materials in the field to match technical specifications and SOP (Standard Operation Procedure) and for the prevention of work accidents, workers must use Personal Protective Equipment (PPE), and install work signs. The duration of the project is 950 calendar days with a budget of Rp. 574,259,927,661.21.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.227-232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Cambio Lofts Apartment Construction Project in South Tangerang is a project owned by PT Graha Indah Semesta which was carried out by PT. Brantas Abipraya (Persero) with a contract value of IDR 640,000,000 for 1369 calendar days. project planning Properis needed to realize the project on time, cost, and quality. For this reason, it is necessary to prepare a project planning that includes organizational structure, site layout, strategy and implementation methods, quality and K3 plans, scheduling, and costs. The data needed in the preparation of Project Planning are project drawings, work plans and requirements, and basic unit prices. In preparing the work schedule using the program Microsoft Project 2019 and project costs using the program. Microsoft Excel 2019 The results of the preparation are, using a functional organizational structure, the strategy is to use two tower cranes and divide work zones, the quality of work is carried out by testing materials in the field to match technical specifications and SOP (Standard Operation Procedure) and for the prevention of work accidents, workers must use Personal Protective Equipment (PPE), and install work signs. The duration of the project is 950 calendar days with a budget of Rp. 574,259,927,661.21.
项目策划了坎比奥阁楼的建设项目
南Tangerang的Cambio loft公寓建设项目是由PT Graha Indah Semesta拥有的项目,由PT. Brantas Abipraya (Persero)执行,合同价值为6.4亿印尼卢比,为期1369个日历日。项目计划是按时、按成本和按质量实现项目所需的属性。因此,有必要准备一个项目计划,包括组织结构,场地布局,战略和实施方法,质量和K3计划,调度和成本。编制《项目规划》所需的资料有:项目图纸、工作计划和要求、基本单价。在使用程序Microsoft Project 2019准备工作时间表和项目成本使用该程序。编制的结果是,采用功能组织结构,策略是使用两台塔吊并划分工作区,工作质量是通过在现场测试材料以匹配技术规范和SOP(标准操作程序)来进行的,并且为了防止工作事故,工人必须使用个人防护装备(PPE),并安装工作标志。项目持续时间为950个日历日,预算为574,259,927,661.21卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信