The use of non-synchronous automatic reclosing in power plants of large industrial enterprises with a complex network configuration

O. Gazizova, A. Sokolov, N. T. Patshin, A. Malafeev, A. Karyakin
{"title":"The use of non-synchronous automatic reclosing in power plants of large industrial enterprises with a complex network configuration","authors":"O. Gazizova, A. Sokolov, N. T. Patshin, A. Malafeev, A. Karyakin","doi":"10.1109/ICOECS46375.2019.8949911","DOIUrl":null,"url":null,"abstract":"One of the main trends in industrial energy is the use of various sources of distributed generation. This is due to the low cost of its own generated electricity and increased reliability of electricity supply to industrial consumers. However, the introduction of objects of distributed generation leads to a significant complication of operating conditions. In particular, it is not excluded the output to the separate work with the power system. This paper focuses on the restoration of synchronous parallel operation with the power grid. Two types of non-synchronous automatic reclosing were investigated: fast-reclosing and switching on at different frequencies. An algorithm has been developed for the operation of non-synchronous automatic reclosing under conditions of distributed generation objects. The conditions under which it is advisable to use this type of automation in industrial power plants are determined. A software package for calculating transient electromechanical processes has been developed, which allows investigating the modes of resynchronization of generators with a network. Studies were conducted on the example of an industrial power plant of complex configuration. Calculations showed that the success of resynchronization depends on the network configuration, unbalance of power in the node and power of the generators. The developed algorithm allows determining the possibility of using asynchronous automatic reclosing at a power plant and developing recommendations for its use.","PeriodicalId":371743,"journal":{"name":"2019 International Conference on Electrotechnical Complexes and Systems (ICOECS)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Electrotechnical Complexes and Systems (ICOECS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOECS46375.2019.8949911","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

One of the main trends in industrial energy is the use of various sources of distributed generation. This is due to the low cost of its own generated electricity and increased reliability of electricity supply to industrial consumers. However, the introduction of objects of distributed generation leads to a significant complication of operating conditions. In particular, it is not excluded the output to the separate work with the power system. This paper focuses on the restoration of synchronous parallel operation with the power grid. Two types of non-synchronous automatic reclosing were investigated: fast-reclosing and switching on at different frequencies. An algorithm has been developed for the operation of non-synchronous automatic reclosing under conditions of distributed generation objects. The conditions under which it is advisable to use this type of automation in industrial power plants are determined. A software package for calculating transient electromechanical processes has been developed, which allows investigating the modes of resynchronization of generators with a network. Studies were conducted on the example of an industrial power plant of complex configuration. Calculations showed that the success of resynchronization depends on the network configuration, unbalance of power in the node and power of the generators. The developed algorithm allows determining the possibility of using asynchronous automatic reclosing at a power plant and developing recommendations for its use.
非同步自动重合闸在网络结构复杂的大型工业企业电厂中的应用
工业能源的主要趋势之一是使用各种来源的分布式发电。这是由于它自己发电的成本低,而且向工业消费者供电的可靠性提高了。然而,分布式发电对象的引入导致了运行条件的显著复杂性。特别是不排除输出要与电力系统单独工作。本文的研究重点是恢复与电网的同步并联运行。研究了两种非同步自动重合闸:快速重合闸和不同频率分闸。提出了一种分布式发电对象条件下的非同步自动重合闸运行算法。确定了在工业发电厂采用这种自动化的适宜条件。开发了一个计算暂态机电过程的软件包,该软件包允许研究发电机与电网的再同步模式。以某复杂结构的工业动力装置为例进行了研究。计算表明,重新同步的成功与否取决于网络配置、节点的功率不平衡和发电机的功率。所开发的算法可以确定在发电厂使用异步自动重合闸的可能性,并为其使用提出建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信