PERENCANAAN BEKISTING DAN PERANCAH PADA GEDUNG BERTINGKAT DENGAN SISTEM ZONASI (STUDI KASUS : PROYEK APARTEMEN DARMO HILL SURABAYA)

Nanda Arditama, S. Sumardi, Nawir Rasidi
{"title":"PERENCANAAN BEKISTING DAN PERANCAH PADA GEDUNG BERTINGKAT DENGAN SISTEM ZONASI (STUDI KASUS : PROYEK APARTEMEN DARMO HILL SURABAYA)","authors":"Nanda Arditama, S. Sumardi, Nawir Rasidi","doi":"10.55404/jos-mrk.2021.02.03.90-98","DOIUrl":null,"url":null,"abstract":"In the implementation method most contractors use conventional formwork which takes longer time. Therefore, it is necessary to use an innovation with semi-conventional system formwork method which is a combination of multiplex and hollow material. The purpose of this study is to analyze the strength of the half-system formwork, its implementation, and the operational costs of the project of 1 to 9 floors with a total area of 5,708.255m2. The data used include shop drawings and work unit prices of Surabaya City 2018. Microsoft Excel 2016 was for the calculations and Microsoft Project 2016 was for the scheduling. The calculations resulted semi-conventional formwork using wood and hollow steel of beam and slab formworks on 161 work days Rp. 2.790.745.668,86.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.90-98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the implementation method most contractors use conventional formwork which takes longer time. Therefore, it is necessary to use an innovation with semi-conventional system formwork method which is a combination of multiplex and hollow material. The purpose of this study is to analyze the strength of the half-system formwork, its implementation, and the operational costs of the project of 1 to 9 floors with a total area of 5,708.255m2. The data used include shop drawings and work unit prices of Surabaya City 2018. Microsoft Excel 2016 was for the calculations and Microsoft Project 2016 was for the scheduling. The calculations resulted semi-conventional formwork using wood and hollow steel of beam and slab formworks on 161 work days Rp. 2.790.745.668,86.
区域系统高层建筑的施工规划和脚手架(案例研究:达莫山泗水公寓项目)
在施工方法中,大多数承包商采用常规模板,耗时较长。因此,有必要采用一种创新的半常规系统模板方法,即复合材料与中空材料相结合。本研究的目的是分析半体系模板的强度,其实施,以及1至9层,总面积为5708.255 m2的项目的运营成本。使用的数据包括2018年泗水市的施工图和工单价。微软Excel 2016用于计算,微软Project 2016用于调度。计算结果表明,在161个工作日Rp. 2.790.745.668,86中,使用木材和空心钢梁和板模板的半常规模板。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信