{"title":"A two-stage hybrid with uniform machines and setup times","authors":"Wanzhen Huang, Shanling Li","doi":"10.1109/IEMT.1997.626954","DOIUrl":null,"url":null,"abstract":"In this paper, we consider a two-stage hybrid flowshop in a semi-conductor industry. We assume that components are grouped into families and a major setup is required when a machine at either stage starts to process a new family. While Stage 1 contains a single machine, Stage 2 contains multiple uniform machines. The objective is to minimize the total makespan. To solve the problem, we develop a heuristic and 8 effective sequencing rules to assign the parts to the machines at both stages. We also present a model to examine the trade-offs between the costs and the speeds of the machines at Stage 2. We also present a model to examine the trade-offs between the costs and the speeds of the machines at Stage 2.","PeriodicalId":227971,"journal":{"name":"Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium","volume":"325 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1997.626954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In this paper, we consider a two-stage hybrid flowshop in a semi-conductor industry. We assume that components are grouped into families and a major setup is required when a machine at either stage starts to process a new family. While Stage 1 contains a single machine, Stage 2 contains multiple uniform machines. The objective is to minimize the total makespan. To solve the problem, we develop a heuristic and 8 effective sequencing rules to assign the parts to the machines at both stages. We also present a model to examine the trade-offs between the costs and the speeds of the machines at Stage 2. We also present a model to examine the trade-offs between the costs and the speeds of the machines at Stage 2.