O. Chernousenko, D. Rindyuk, V. Peshko, I. Bednarska
{"title":"Effect of Start-up Operating Modes on the Cyclic Damage of Thermal Power Plant Units","authors":"O. Chernousenko, D. Rindyuk, V. Peshko, I. Bednarska","doi":"10.1109/ESS57819.2022.9969301","DOIUrl":null,"url":null,"abstract":"The paper presents a comparative assessment of the impact of the nature of start-up schedule of the power unit on the cyclic damage of turbine equipment. Two different start-up schedules for real power plants are considered. They differ in the steam parameters and in the duration of some stages of start-up. A mathematical model for calculating low-cycle fatigue in high-temperature turbine rotors is presented. The calculation of the thermal and stress-strain state of the rotor in a non-stationary setting is performed. The areas of concentration of stresses in the rotor are established. It is established that when working on one of the start-up schedules, due to more uniform heating of the flowing part of the turbine and rational start-up time, it was possible to reduce the temperature gradients and the amplitude of stresses in most areas of the rotor. As a result, the permissible number of start-up cycles increased by 15.7%.","PeriodicalId":432063,"journal":{"name":"2022 IEEE 8th International Conference on Energy Smart Systems (ESS)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 8th International Conference on Energy Smart Systems (ESS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESS57819.2022.9969301","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The paper presents a comparative assessment of the impact of the nature of start-up schedule of the power unit on the cyclic damage of turbine equipment. Two different start-up schedules for real power plants are considered. They differ in the steam parameters and in the duration of some stages of start-up. A mathematical model for calculating low-cycle fatigue in high-temperature turbine rotors is presented. The calculation of the thermal and stress-strain state of the rotor in a non-stationary setting is performed. The areas of concentration of stresses in the rotor are established. It is established that when working on one of the start-up schedules, due to more uniform heating of the flowing part of the turbine and rational start-up time, it was possible to reduce the temperature gradients and the amplitude of stresses in most areas of the rotor. As a result, the permissible number of start-up cycles increased by 15.7%.