{"title":"Simultaneous cycle-time reduction and output enhancement in a fully loaded foundry wafer fab","authors":"C. M. Ho, T. Chen, P. Hseih, C. Chu, E. Houn, K. J. Su, P. Wang, W. C. Yew, S.W. Sun","doi":"10.1109/ISSM.2000.993617","DOIUrl":null,"url":null,"abstract":"A case study is reported in how cycle-time reduction and output enhancement were accomplished simultaneously in a fully loaded foundry wafer fab. Within one-year period of time, a 50 K per month capacity 6\" foundry fab improved its overall cycle-time by 35% with a concurrent fab wafer-output increase of over 20%. In the mean time, the fab WIP level was reduced by more than 20% without any compromise in line-yield or customer delivery.","PeriodicalId":104122,"journal":{"name":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2000.993617","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

A case study is reported in how cycle-time reduction and output enhancement were accomplished simultaneously in a fully loaded foundry wafer fab. Within one-year period of time, a 50 K per month capacity 6" foundry fab improved its overall cycle-time by 35% with a concurrent fab wafer-output increase of over 20%. In the mean time, the fab WIP level was reduced by more than 20% without any compromise in line-yield or customer delivery.
在满负荷的晶圆厂中同时缩短周期和提高产量
本文报道了在一个满载的晶圆厂中如何同时实现缩短周期和提高产量的案例研究。在一年的时间里,一个每月50 K产能的6英寸晶圆代工厂将其整体周期时间缩短了35%,同时晶圆产量增加了20%以上。与此同时,晶圆厂的在制品水平降低了20%以上,而生产线良率和客户交货期没有任何影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信