{"title":"Reverse Logistics Inventory Model with the Partial Backlogging during Shortage Period","authors":"Mang Chen, Z. Fu","doi":"10.1109/LEITS.2010.5665016","DOIUrl":null,"url":null,"abstract":"The characteristics of reverse logistics make the inventory management issues very complex. Once shortage happens, the reverse logistics network nodes will have insufficient workload even stop work. The previous studies about shortage more established on the assumptions of complete backlogging or complete losing, but the partial backlogging problem is less discussed. So this study develops a partial backlogging reverse logistics inventory model, and proposes a new algorithm to minimize the total cost. Finally, a practical example of the numerical analysis is given.","PeriodicalId":173716,"journal":{"name":"2010 International Conference on Logistics Engineering and Intelligent Transportation Systems","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Logistics Engineering and Intelligent Transportation Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LEITS.2010.5665016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The characteristics of reverse logistics make the inventory management issues very complex. Once shortage happens, the reverse logistics network nodes will have insufficient workload even stop work. The previous studies about shortage more established on the assumptions of complete backlogging or complete losing, but the partial backlogging problem is less discussed. So this study develops a partial backlogging reverse logistics inventory model, and proposes a new algorithm to minimize the total cost. Finally, a practical example of the numerical analysis is given.