Application of Fuzzy Comprehensive Evaluation Model in the Risk Assessment for Logistics Park Construction

Wang Yuzhou, C. Bin
{"title":"Application of Fuzzy Comprehensive Evaluation Model in the Risk Assessment for Logistics Park Construction","authors":"Wang Yuzhou, C. Bin","doi":"10.1109/ICOIP.2010.96","DOIUrl":null,"url":null,"abstract":"In recent years, a logistics park construction wave has emerged rapidly in China. At the same time, there is a high vacancy rate in the use. There is a high risk because of many uncertainty factors existing in the whole cycle of modern logistics park construction. The failure of logistics park construction can cause large losses, which are difficult to restore. How to properly evaluate the risks in logistics park construction and manage them has become an important issue. The paper builds an index system on risk evaluation for construction of logistics park, presents fuzzy comprehensive evaluation model and evaluates the risk of Aviation Logistics Park in Chengdu using the model. Case shows the effectiveness and feasibility of themethod.","PeriodicalId":333542,"journal":{"name":"2010 International Conference on Optoelectronics and Image Processing","volume":"243 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Optoelectronics and Image Processing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOIP.2010.96","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In recent years, a logistics park construction wave has emerged rapidly in China. At the same time, there is a high vacancy rate in the use. There is a high risk because of many uncertainty factors existing in the whole cycle of modern logistics park construction. The failure of logistics park construction can cause large losses, which are difficult to restore. How to properly evaluate the risks in logistics park construction and manage them has become an important issue. The paper builds an index system on risk evaluation for construction of logistics park, presents fuzzy comprehensive evaluation model and evaluates the risk of Aviation Logistics Park in Chengdu using the model. Case shows the effectiveness and feasibility of themethod.
模糊综合评价模型在物流园区建设风险评价中的应用
近年来,物流园区建设浪潮在中国迅速兴起。同时,在使用中也存在着很高的空置率。由于现代物流园区建设的全周期存在诸多不确定因素,因此具有较高的风险性。物流园区建设的失败会造成巨大的损失,这些损失很难恢复。如何正确评估和管理物流园区建设中的风险已成为一个重要的问题。本文构建了物流园区建设风险评价指标体系,提出了模糊综合评价模型,并运用该模型对成都航空物流园区的风险进行了评价。实例验证了该方法的有效性和可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信