Ireland's approach for the connection of large amounts of renewable generation

Paul D. Smith, P. Cuffe, S. Grimes, T. Hearne
{"title":"Ireland's approach for the connection of large amounts of renewable generation","authors":"Paul D. Smith, P. Cuffe, S. Grimes, T. Hearne","doi":"10.1109/PES.2010.5589616","DOIUrl":null,"url":null,"abstract":"This paper discusses the connection policies adopted to facilitate the large number of wind farms seeking access to the Irish power system. A key feature is a grouped connection offer process that provides certainty for wind project developers and optimises the development of the network. A further interesting feature is the development of a “wind cluster” concept which permits semi-dedicated MV networks for the connection of a group of adjacent wind farms, together with equitable arrangements for sharing the financial burden of construction between developers.","PeriodicalId":177545,"journal":{"name":"IEEE PES General Meeting","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2010.5589616","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

This paper discusses the connection policies adopted to facilitate the large number of wind farms seeking access to the Irish power system. A key feature is a grouped connection offer process that provides certainty for wind project developers and optimises the development of the network. A further interesting feature is the development of a “wind cluster” concept which permits semi-dedicated MV networks for the connection of a group of adjacent wind farms, together with equitable arrangements for sharing the financial burden of construction between developers.
爱尔兰连接大量可再生能源发电的方法
本文讨论了为方便大量风电场进入爱尔兰电力系统而采取的连接政策。一个关键特征是分组连接提供过程,为风电项目开发商提供确定性,并优化网络的发展。另一个有趣的特点是“风力集群”概念的发展,该概念允许半专用中压网络连接一组相邻的风力发电场,同时公平安排开发商分担建设的经济负担。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信