{"title":"Ireland's approach for the connection of large amounts of renewable generation","authors":"Paul D. Smith, P. Cuffe, S. Grimes, T. Hearne","doi":"10.1109/PES.2010.5589616","DOIUrl":null,"url":null,"abstract":"This paper discusses the connection policies adopted to facilitate the large number of wind farms seeking access to the Irish power system. A key feature is a grouped connection offer process that provides certainty for wind project developers and optimises the development of the network. A further interesting feature is the development of a “wind cluster” concept which permits semi-dedicated MV networks for the connection of a group of adjacent wind farms, together with equitable arrangements for sharing the financial burden of construction between developers.","PeriodicalId":177545,"journal":{"name":"IEEE PES General Meeting","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2010.5589616","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14
Abstract
This paper discusses the connection policies adopted to facilitate the large number of wind farms seeking access to the Irish power system. A key feature is a grouped connection offer process that provides certainty for wind project developers and optimises the development of the network. A further interesting feature is the development of a “wind cluster” concept which permits semi-dedicated MV networks for the connection of a group of adjacent wind farms, together with equitable arrangements for sharing the financial burden of construction between developers.