Load Cluster Management Considering Response Uncertainty

Wei Zeng, Minjie Sun, Bo Chen, Wei He, Yangqi Huang, Kansheng Yu
{"title":"Load Cluster Management Considering Response Uncertainty","authors":"Wei Zeng, Minjie Sun, Bo Chen, Wei He, Yangqi Huang, Kansheng Yu","doi":"10.1109/CICED.2018.8592587","DOIUrl":null,"url":null,"abstract":"The elastic load on demand side can change with the fluctuation electricity price, so it could be modeled as the adjustable load cluster and involved into power dispatching with traditional generation unit, which can improve the flexibility of the power system. Due to the influence of various factors, such as the response to electricity price is not timely, signal transmission delay, the user's habits is difficult to be changed, and the response amount and expected value always exist in a certain range of deviation. In this paper, the value at risk (VaR) is used to measure the risk loss caused by the uncertainty of the load cluster response, then VaR is introduced as a loss measure to participate in the optimization of the power dispatching model and establish a joint scheduling model. Through the actual example analysis, the results show that, due to the risk loss of the adjustable load cluster is considered, the risk loss caused by uncertainty response is reduced. The research has practical application prospect to the implementation of DSM projects.","PeriodicalId":142885,"journal":{"name":"2018 China International Conference on Electricity Distribution (CICED)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 China International Conference on Electricity Distribution (CICED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICED.2018.8592587","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The elastic load on demand side can change with the fluctuation electricity price, so it could be modeled as the adjustable load cluster and involved into power dispatching with traditional generation unit, which can improve the flexibility of the power system. Due to the influence of various factors, such as the response to electricity price is not timely, signal transmission delay, the user's habits is difficult to be changed, and the response amount and expected value always exist in a certain range of deviation. In this paper, the value at risk (VaR) is used to measure the risk loss caused by the uncertainty of the load cluster response, then VaR is introduced as a loss measure to participate in the optimization of the power dispatching model and establish a joint scheduling model. Through the actual example analysis, the results show that, due to the risk loss of the adjustable load cluster is considered, the risk loss caused by uncertainty response is reduced. The research has practical application prospect to the implementation of DSM projects.
考虑响应不确定性的负载集群管理
需求侧弹性负荷可以随着电价的波动而变化,因此可以将其建模为可调负荷集群,与传统发电机组共同参与电力调度,提高了电力系统的灵活性。由于各种因素的影响,如对电价的响应不及时、信号传输延迟、用户习惯难以改变、响应量与期望值始终存在一定范围的偏差等。本文采用风险值VaR (value at risk)来衡量负荷集群响应的不确定性所带来的风险损失,然后引入VaR作为损失度量参与电力调度模型的优化,建立联合调度模型。通过实例分析,结果表明,由于考虑了可调负荷集群的风险损失,降低了不确定性响应带来的风险损失。本研究对电力需求侧管理项目的实施具有实际应用前景。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信