Project Risk Assessment in Enterprises with the Use of TOPSIS Method in the 2014–2020 Perspective(Zarzadzanie ryzykiem projektu w przedsiebiorstwie w ramach perspektywy 2014–2020 z wykorzystaniem metody TOPSIS)
{"title":"Project Risk Assessment in Enterprises with the Use of TOPSIS Method in the 2014–2020 Perspective(Zarzadzanie ryzykiem projektu w przedsiebiorstwie w ramach perspektywy 2014–2020 z wykorzystaniem metody TOPSIS)","authors":"L. Walaszczyk","doi":"10.7172/1733-9758.2016.21.6","DOIUrl":null,"url":null,"abstract":"Nowadays the homogeneous market with 500 billion consumers, 220 billion employees and 20 billion employers is the main instrument enabling the development of competitive and innovative Europe.One of the ways for companies to design innovative products is to participate in the execution of different projects. Each country offers many initiatives, mainly financed by the European Union (it is currently the 2014–2020 perspective). Thanks to participation in them, employers have the possibility to improve their business and develop products they need. In order to achieve a product of a good quality, it must be managed correctly. There are a lot of methods which can be used in the project management process; however, the chosen methods should be clear and give proper results. One of the crucial aspects of the evaluation process is risk assessment as it enables one to find any abnormalities in the project. Employers do not use any specialised tools enabling them to evaluate the risk during the project development. That is why many companies make products that are very difficult to sell on the market or even to use due to many defects. The risk can be evaluated with different methods, both qualitative and quantitative. The main objective of the article is to present the values for the company when using the semi-quantitative TOPSIS method (Hwang and Yoon, 1981) to measure risk in the projects executed in the 2014–2020 perspective. Therefore, the author indicates the advantages of TOPSIS method and presents how it can be used in practice.","PeriodicalId":338433,"journal":{"name":"The research reports","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The research reports","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7172/1733-9758.2016.21.6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Nowadays the homogeneous market with 500 billion consumers, 220 billion employees and 20 billion employers is the main instrument enabling the development of competitive and innovative Europe.One of the ways for companies to design innovative products is to participate in the execution of different projects. Each country offers many initiatives, mainly financed by the European Union (it is currently the 2014–2020 perspective). Thanks to participation in them, employers have the possibility to improve their business and develop products they need. In order to achieve a product of a good quality, it must be managed correctly. There are a lot of methods which can be used in the project management process; however, the chosen methods should be clear and give proper results. One of the crucial aspects of the evaluation process is risk assessment as it enables one to find any abnormalities in the project. Employers do not use any specialised tools enabling them to evaluate the risk during the project development. That is why many companies make products that are very difficult to sell on the market or even to use due to many defects. The risk can be evaluated with different methods, both qualitative and quantitative. The main objective of the article is to present the values for the company when using the semi-quantitative TOPSIS method (Hwang and Yoon, 1981) to measure risk in the projects executed in the 2014–2020 perspective. Therefore, the author indicates the advantages of TOPSIS method and presents how it can be used in practice.
如今,拥有5000亿消费者、2200亿雇员和200亿雇主的同质化市场是推动欧洲发展竞争和创新的主要工具。公司设计创新产品的方式之一是参与不同项目的执行。每个国家都提出了许多倡议,主要由欧盟资助(目前是2014-2020年的展望)。由于参与其中,雇主有可能改善他们的业务和开发他们需要的产品。为了获得高质量的产品,必须正确管理。在项目管理过程中可以使用的方法有很多;然而,所选择的方法应该是明确的,并给出适当的结果。评估过程的一个关键方面是风险评估,因为它使人们能够发现项目中的任何异常。在项目开发过程中,雇主没有使用任何专门的工具来评估风险。这就是为什么许多公司制造的产品由于许多缺陷而很难在市场上销售甚至使用。风险可以用不同的方法进行评估,包括定性的和定量的。本文的主要目的是在使用半定量TOPSIS方法(Hwang and Yoon, 1981)来衡量2014-2020年执行项目中的风险时,为公司呈现价值。因此,作者指出了TOPSIS方法的优点,并介绍了该方法在实践中的应用。