Production Management Model to Reduce Cycle Times Using Lean Manufacturing in a Company in the Metalworking Sector

Erick Hanson Bolaños Valencia, Yeimy Salvatierra García, Grimaldo Quispe Santivañez, Elva Castañeda
{"title":"Production Management Model to Reduce Cycle Times Using Lean Manufacturing in a Company in the Metalworking Sector","authors":"Erick Hanson Bolaños Valencia, Yeimy Salvatierra García, Grimaldo Quispe Santivañez, Elva Castañeda","doi":"10.1109/ICIM56520.2022.00040","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.","PeriodicalId":391964,"journal":{"name":"2022 8th International Conference on Information Management (ICIM)","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 8th International Conference on Information Management (ICIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIM56520.2022.00040","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.
生产管理模式,以减少周期时间在一个公司在金属加工部门使用精益制造
本研究的目的是解决金属加工部门公司最常见的问题之一,由于其设置时间管理不善,加工过程呈现高度可变性。在此基础上,运用VSM和SMED建立了一个基于精益制造的四阶段管理模型。该模型在一家金属加工中小企业中得到了验证,特别是在其焊接过程中,其准备时间减少了87.7%,周期时间减少了3%,生产能力减少了4.2%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信