Phase B and breadboard results for the TOPEX POSEIDON FOLLOW-ON mission

L. Rey, N. Suinot, P. Oudart, G. Carayon
{"title":"Phase B and breadboard results for the TOPEX POSEIDON FOLLOW-ON mission","authors":"L. Rey, N. Suinot, P. Oudart, G. Carayon","doi":"10.1109/IGARSS.1996.516314","DOIUrl":null,"url":null,"abstract":"Pursuing the successful TOPEX POSEIDON altimetry mission, activities for the follow-on program are in progress. ALCATEL ESPACE completes the phase B of the next generation altimeter funded by the French Space Agency (CNES). The main evolution with respect to the former POSEIDON-1 rely upon the dual frequency (Ku & C bands) operation, and the doubled processed range depth within the same mass and power budgets. The altimeter design and development resulting from study and breadboarding activities are presented with regards to the function requirements and also the expected altimeter performances.","PeriodicalId":190696,"journal":{"name":"IGARSS '96. 1996 International Geoscience and Remote Sensing Symposium","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IGARSS '96. 1996 International Geoscience and Remote Sensing Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IGARSS.1996.516314","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Pursuing the successful TOPEX POSEIDON altimetry mission, activities for the follow-on program are in progress. ALCATEL ESPACE completes the phase B of the next generation altimeter funded by the French Space Agency (CNES). The main evolution with respect to the former POSEIDON-1 rely upon the dual frequency (Ku & C bands) operation, and the doubled processed range depth within the same mass and power budgets. The altimeter design and development resulting from study and breadboarding activities are presented with regards to the function requirements and also the expected altimeter performances.
TOPEX POSEIDON后续任务的B阶段和面包板结果
为了完成成功的TOPEX POSEIDON测高任务,后续项目的活动正在进行中。阿尔卡特空间公司完成了由法国航天局(CNES)资助的下一代高度计的B阶段工作。与前POSEIDON-1相比,主要的改进依赖于双频(Ku & C波段)操作,以及在相同质量和功率预算下的双倍处理范围深度。从功能要求和预期的高度计性能方面介绍了研究和面包板活动所产生的高度计设计和开发。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信