{"title":"Research of New Method About the Test of Secondary System for Refurbishment and Extension of Smart Substation","authors":"Fan Chen, Nie Yi-min, Z. Guoqing, Yuan Hao, Dou Renhui","doi":"10.1109/CICED.2018.8592589","DOIUrl":null,"url":null,"abstract":"As the large-scale construction of smart substation, the refurbishment and extension of smart substations become more and more. The state-of-art about the test of the refurbishment and extension of secondary system in smart substation is introduced and the problems and new needs are described. The new test process combined pre-test and on-site test is presented, and the new method about the test is discussed in detail from four aspects which are the configuration and verification of SCD file, the construction of virtual simulation and test platform, the pre-test and the join-test on-site. The security measure for the on-site test is also provided. At last, take the extension of line as an example and make analysis; it will be helpful to the test refurbishment and extension of secondary system in smart substation.","PeriodicalId":142885,"journal":{"name":"2018 China International Conference on Electricity Distribution (CICED)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 China International Conference on Electricity Distribution (CICED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICED.2018.8592589","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As the large-scale construction of smart substation, the refurbishment and extension of smart substations become more and more. The state-of-art about the test of the refurbishment and extension of secondary system in smart substation is introduced and the problems and new needs are described. The new test process combined pre-test and on-site test is presented, and the new method about the test is discussed in detail from four aspects which are the configuration and verification of SCD file, the construction of virtual simulation and test platform, the pre-test and the join-test on-site. The security measure for the on-site test is also provided. At last, take the extension of line as an example and make analysis; it will be helpful to the test refurbishment and extension of secondary system in smart substation.
智能变电站改扩建二次系统测试新方法研究
随着智能变电站的大规模建设,智能变电站的翻新和扩建也越来越多。介绍了智能变电站二次系统改扩建试验的现状,指出了其中存在的问题和新的需求。提出了预试验与现场试验相结合的新型试验流程,并从SCD文件的配置与验证、虚拟仿真与试验平台的搭建、预试验与现场联合试验四个方面详细论述了新的试验方法。并提出了现场试验的安全措施。最后,以延长线为例进行分析;对智能变电站二次系统的试验改造和扩建具有一定的指导意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信