{"title":"Flexibility Integrated System Model and Building of Construction Supply Chain","authors":"Y. Zhai","doi":"10.1109/ICMSS.2009.5302101","DOIUrl":null,"url":null,"abstract":"With the instability of competitive environment and the uncertainty of project owner's demand, improving flexibility of construction supply chain (CSC) will promote the competence of enterprise, supply chain and industry. The paper proposes the conceptual model and flexible system integrated model of CSC. And the paper considers that the enhancement of CSC flexibility should integrate three levels: point-line-plane (enterprise-supply chain-industry). Keywords—construction supply chain (CSC), flexibility, system integrated model, perspective of point-line-plane","PeriodicalId":267621,"journal":{"name":"2009 International Conference on Management and Service Science","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Management and Service Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSS.2009.5302101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
With the instability of competitive environment and the uncertainty of project owner's demand, improving flexibility of construction supply chain (CSC) will promote the competence of enterprise, supply chain and industry. The paper proposes the conceptual model and flexible system integrated model of CSC. And the paper considers that the enhancement of CSC flexibility should integrate three levels: point-line-plane (enterprise-supply chain-industry). Keywords—construction supply chain (CSC), flexibility, system integrated model, perspective of point-line-plane