Reliability assessment of used parts: an enabler for asset recovery

W. Reyes, M. Moore, Craig Bartholomew, R. Currence, R. Siegel
{"title":"Reliability assessment of used parts: an enabler for asset recovery","authors":"W. Reyes, M. Moore, Craig Bartholomew, R. Currence, R. Siegel","doi":"10.1109/ISEE.1995.514956","DOIUrl":null,"url":null,"abstract":"At Xerox, a major management commitment is a 0% material disposition to the landfill. This is accomplished through a process called Asset Recovery Management(ARM) which incorporates into our production design the concept of total recycling. This paper discusses the methodology used to assess the reliability and acceptability of used parts for use in remanufacturing of machines. The most important phases are the failure analysis of field failures and the design and implementation of a production test system to sort for acceptable parts. A case study on a used motor is described to amplify on the methodology suggested here.","PeriodicalId":338075,"journal":{"name":"Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEE.1995.514956","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

At Xerox, a major management commitment is a 0% material disposition to the landfill. This is accomplished through a process called Asset Recovery Management(ARM) which incorporates into our production design the concept of total recycling. This paper discusses the methodology used to assess the reliability and acceptability of used parts for use in remanufacturing of machines. The most important phases are the failure analysis of field failures and the design and implementation of a production test system to sort for acceptable parts. A case study on a used motor is described to amplify on the methodology suggested here.
废旧部件的可靠性评估:资产回收的推动者
在施乐公司,一项主要的管理承诺是0%的材料填埋。这是通过一个称为资产回收管理(ARM)的过程来实现的,该过程将完全回收的概念融入到我们的生产设计中。本文讨论了用于评估机器再制造中使用的旧零件的可靠性和可接受性的方法。最重要的阶段是现场故障的失效分析和生产测试系统的设计和实施,以筛选可接受的部件。本文描述了一个二手电机的案例研究,以扩大本文所建议的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信