The method of scheduling construction projects increasing the use of resources of the general contractor

M. Tomczak, P. Jaśkowski
{"title":"The method of scheduling construction projects increasing the use of resources of the general contractor","authors":"M. Tomczak, P. Jaśkowski","doi":"10.3846/mbmst.2019.019","DOIUrl":null,"url":null,"abstract":"In carrying out construction projects, enterprises strive to obtain the highest degree of harmonization of the\nwork of the resources involved. It is manifested in ensuring continuous and regular production with a full usage of\ntheir executive potential. The purpose of harmonization is to eliminate unjustified interruptions in the work of resources. When planning the realization of non-repetitive construction projects, one should use methods of scheduling\nthat allow the analysis of the project model not only as a function of time. It is also important to take into account the\neffectiveness of using your own resources and limitations in their availability. The article analyzes the problem of\nharmonizing the work of crews of the general contractor, performing non-rhythmic, non-cyclical and inhomogeneous\nprocesses under the assumption of deterministic operating conditions. An important issue from the point of view of\nreducing the costs of crews’ employment is the continuity of their work. A mathematical model was developed concerning the problem of minimization of downtime in the work of the general contractor crews with a directively fixed\ntime and limit of the project realization cost, taking into account the limitations in the availability of crews and the\npossibility to outsource works to subcontractors. The possibility of subcontracting works does not allow for a clear indication in the project model sequences of processes carried out by crews and the usage of previously developed\nscheduling methods. The method of solving the model (in a linear form with continuous and binary variables) is presented in the example. Additionally, the proposed method allows analyzing the impact of the amount of downtime at\nwork on the duration of the project and the impact of the work outsourced to subcontractors on the continuity of the\ngeneral contractor’s work.","PeriodicalId":169478,"journal":{"name":"The proceedings of the 13th international conference \"Modern Building Materials, Structures and Techniques\" (MBMST 2019)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The proceedings of the 13th international conference \"Modern Building Materials, Structures and Techniques\" (MBMST 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3846/mbmst.2019.019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

In carrying out construction projects, enterprises strive to obtain the highest degree of harmonization of the work of the resources involved. It is manifested in ensuring continuous and regular production with a full usage of their executive potential. The purpose of harmonization is to eliminate unjustified interruptions in the work of resources. When planning the realization of non-repetitive construction projects, one should use methods of scheduling that allow the analysis of the project model not only as a function of time. It is also important to take into account the effectiveness of using your own resources and limitations in their availability. The article analyzes the problem of harmonizing the work of crews of the general contractor, performing non-rhythmic, non-cyclical and inhomogeneous processes under the assumption of deterministic operating conditions. An important issue from the point of view of reducing the costs of crews’ employment is the continuity of their work. A mathematical model was developed concerning the problem of minimization of downtime in the work of the general contractor crews with a directively fixed time and limit of the project realization cost, taking into account the limitations in the availability of crews and the possibility to outsource works to subcontractors. The possibility of subcontracting works does not allow for a clear indication in the project model sequences of processes carried out by crews and the usage of previously developed scheduling methods. The method of solving the model (in a linear form with continuous and binary variables) is presented in the example. Additionally, the proposed method allows analyzing the impact of the amount of downtime at work on the duration of the project and the impact of the work outsourced to subcontractors on the continuity of the general contractor’s work.
施工项目调度方法提高了总承包商的资源利用率
在开展建设项目时,企业力求使所涉及的各项资源的工作达到最高的协调程度。它表现在确保连续和正常的生产,充分利用他们的执行潜力。协调的目的是消除资源工作中不合理的中断。当计划实现非重复建设项目时,应该使用允许将项目模型分析为不仅仅是时间函数的调度方法。同样重要的是要考虑到使用自己资源的有效性和可用性的局限性。本文分析了在确定的运行条件下,总承包商各班组进行非节奏、非周期、非均匀过程的协调问题。从降低船员雇佣成本的角度来看,一个重要的问题是他们工作的连续性。考虑到工作人员可用性的限制和将工作外包给分包商的可能性,建立了一个数学模型,讨论了总承包商工作人员在直接固定时间和项目实现成本限制下的停机时间最小化问题。分包工程的可能性不允许在项目模型中明确指出由工作人员执行的过程顺序和使用先前开发的调度方法。文中给出了求解该模型(连续变量和二元变量线性形式)的方法。此外,建议的方法允许分析停工时间对项目持续时间的影响,以及外包给分包商的工作对总承包商工作连续性的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信