ANALISIS PENAMBAHAN PASIR DAN SEMEN TERHADAP NILAI CBR TANAH DASAR DESA SUKODADI KABUPATEN LAMONGAN

Amalia Varyezqa Dyas, Gerard Aponno, Armin Naibaho
{"title":"ANALISIS PENAMBAHAN PASIR DAN SEMEN TERHADAP NILAI CBR TANAH DASAR DESA SUKODADI KABUPATEN LAMONGAN","authors":"Amalia Varyezqa Dyas, Gerard Aponno, Armin Naibaho","doi":"10.55404/jos-mrk.2021.02.03.261-266","DOIUrl":null,"url":null,"abstract":"Soil is a factor that can affect the structure of road construction. The CBR value is one of the parameters to determine the bearing capacity of the soil, if the CBR value is high then the soil bearing capacity is good, while if the CBR value is low then the soil needs to be stabilized. The purpose of this thesis is to determine the characteristics of the soil, determine the CBR value of the soil before and after stabilization, develop an implementation method and budget plan for the stabilized earthwork. This research includes water content test, density test, specific gravity test, grain analysis with hydrometer, limit Atterberg test, compaction test (modified), and CBR test (modified, soaked-unsoaked). In this test, variations of the addition of sand and cement were 5%, 10%, 15%, 20%, and 25% of the dry weight of the soil, respectively. From the test results, showing soil classification according to AASHTO A-7-6 with a value of soaked CBR 2.98%. Variations addition of sand and cement by 5% is used as a soil stabilization with the value of soaked CBR 26.31%. Stabilization work using Soil Stabilizer/Pulvi Mixer, Watertank Truck, Motor Grader, Vibro Roller, Sheepfoot Roller, Dump Truck, etc. with a Budget Plan of IDR. 6,505,291,980 (Six Billions Five Hundred Five Millions Two Hundred Ninety One Thousands Nine Hundred Eighty Indonesian Rupiahs) .","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.261-266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Soil is a factor that can affect the structure of road construction. The CBR value is one of the parameters to determine the bearing capacity of the soil, if the CBR value is high then the soil bearing capacity is good, while if the CBR value is low then the soil needs to be stabilized. The purpose of this thesis is to determine the characteristics of the soil, determine the CBR value of the soil before and after stabilization, develop an implementation method and budget plan for the stabilized earthwork. This research includes water content test, density test, specific gravity test, grain analysis with hydrometer, limit Atterberg test, compaction test (modified), and CBR test (modified, soaked-unsoaked). In this test, variations of the addition of sand and cement were 5%, 10%, 15%, 20%, and 25% of the dry weight of the soil, respectively. From the test results, showing soil classification according to AASHTO A-7-6 with a value of soaked CBR 2.98%. Variations addition of sand and cement by 5% is used as a soil stabilization with the value of soaked CBR 26.31%. Stabilization work using Soil Stabilizer/Pulvi Mixer, Watertank Truck, Motor Grader, Vibro Roller, Sheepfoot Roller, Dump Truck, etc. with a Budget Plan of IDR. 6,505,291,980 (Six Billions Five Hundred Five Millions Two Hundred Ninety One Thousands Nine Hundred Eighty Indonesian Rupiahs) .
土壤是影响道路施工结构的重要因素。CBR值是决定土壤承载力的参数之一,CBR值高说明土壤承载力好,CBR值低说明土壤需要稳定。本文的目的是确定土的特性,确定稳定前后土的CBR值,制定稳定土方工程的实施方法和预算方案。本研究包括含水量试验、密度试验、比重试验、颗粒比重计分析、极限阿特伯格试验、压实试验(改良)和CBR试验(改良、浸泡-未浸泡)。在本试验中,砂和水泥添加量的变化分别为土干重的5%、10%、15%、20%和25%。从试验结果来看,土壤分类按照AASHTO a -7-6,浸渍CBR值为2.98%。砂和水泥掺入量变化5%作为稳定土,浸渍CBR值为26.31%。使用土壤稳定机/混合机、水罐车、平地机、振动压路机、羊脚压路机、自卸车等进行稳定工作,预算计划为IDR。6,505,291,980(六十亿五亿五千万九千九百八十印尼盾)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信