Recloser-fuse coordination tool for distributed generation installed capacity enhancement

A. Supannon, P. Jirapong
{"title":"Recloser-fuse coordination tool for distributed generation installed capacity enhancement","authors":"A. Supannon, P. Jirapong","doi":"10.1109/ISGT-ASIA.2015.7387104","DOIUrl":null,"url":null,"abstract":"This paper presents a tool for improving recloser-fuse coordination to enhance distributed generation (DG) installed capacity in electrical distribution systems. The proposed tool could be used to solve recloser-fuse miscoordination problems based on fuse-saving principles. Moreover, it can increase power transfer capability from DG to load by changing the time dial of the recloser and fuse size simultaneously. This tool was developed by writing DIgSILENT Programing Language (DPL) script in DIgSILENT PowerFactory software by considering many conditions such as fault locations, DG types, DG locations and DG sizes. The proposed tool has been implemented in the currently functioning 22 kV Mae Sariang distribution system of the Provincial Electricity Authority of Thailand (PEA). The test results showed that the proposed tool could be used to improve recloser-fuse coordination with a suitable recloser time dial and fuse size, resulting in the maximum capacity of DG connected at any location in the distribution system.","PeriodicalId":208739,"journal":{"name":"2015 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","volume":"144 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT-ASIA.2015.7387104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

This paper presents a tool for improving recloser-fuse coordination to enhance distributed generation (DG) installed capacity in electrical distribution systems. The proposed tool could be used to solve recloser-fuse miscoordination problems based on fuse-saving principles. Moreover, it can increase power transfer capability from DG to load by changing the time dial of the recloser and fuse size simultaneously. This tool was developed by writing DIgSILENT Programing Language (DPL) script in DIgSILENT PowerFactory software by considering many conditions such as fault locations, DG types, DG locations and DG sizes. The proposed tool has been implemented in the currently functioning 22 kV Mae Sariang distribution system of the Provincial Electricity Authority of Thailand (PEA). The test results showed that the proposed tool could be used to improve recloser-fuse coordination with a suitable recloser time dial and fuse size, resulting in the maximum capacity of DG connected at any location in the distribution system.
提高分布式发电装机容量的合闸-熔断器协调工具
本文提出了一种改进重合闸-熔断器协调的方法,以提高配电系统中的分布式发电装机容量。该工具可用于解决基于熔断器保护原理的重合闸-熔断器失配问题。此外,通过同时改变重合闸和熔断器的时间刻度,可以增加DG到负载的功率传输能力。该工具是在DIgSILENT PowerFactory软件中编写DIgSILENT编程语言(DPL)脚本,综合考虑故障位置、DG类型、DG位置、DG大小等多种条件而开发的。拟议的工具已在泰国省电力局(PEA)目前运行的22千伏Mae Sariang配电系统中实施。测试结果表明,该工具可以通过适当的重合闸时间刻度和熔断器尺寸来改善重合闸-熔断器的协调性,从而使DG在配电系统中任何位置的连接容量达到最大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信