Phasor measurement unit integration: A review on optimal PMU placement methods in power system

Subrina Noureen, Vishwajit Roy, S. Bayne
{"title":"Phasor measurement unit integration: A review on optimal PMU placement methods in power system","authors":"Subrina Noureen, Vishwajit Roy, S. Bayne","doi":"10.1109/R10-HTC.2017.8288967","DOIUrl":null,"url":null,"abstract":"The Phasor Measurement Unit (PMU) is an imperative part for monitoring, protecting and controlling the current power system. For the current power systems, PMUs not only offer the synchronized measurements of real-time data of voltage but also the current and frequency. Placement of PMUs in each bus for monitoring the system is not feasible from economic point of view and also for big data handling. So it is an obligatory matter to reduce the number of PMUs in the bus system with the aim of attaining the maximum power system observation. Different techniques are being applied from past to present to solve this optimum PMU placement (OPP) problem such as heuristic method, mathematical programing. Heuristic method is a quick experience-based technique for solving the optimization problems. Various optimization methods for solving the OPP problems are being reviewed in this paper.","PeriodicalId":411099,"journal":{"name":"2017 IEEE Region 10 Humanitarian Technology Conference (R10-HTC)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"23","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE Region 10 Humanitarian Technology Conference (R10-HTC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/R10-HTC.2017.8288967","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 23

Abstract

The Phasor Measurement Unit (PMU) is an imperative part for monitoring, protecting and controlling the current power system. For the current power systems, PMUs not only offer the synchronized measurements of real-time data of voltage but also the current and frequency. Placement of PMUs in each bus for monitoring the system is not feasible from economic point of view and also for big data handling. So it is an obligatory matter to reduce the number of PMUs in the bus system with the aim of attaining the maximum power system observation. Different techniques are being applied from past to present to solve this optimum PMU placement (OPP) problem such as heuristic method, mathematical programing. Heuristic method is a quick experience-based technique for solving the optimization problems. Various optimization methods for solving the OPP problems are being reviewed in this paper.
相量测量单元集成:电力系统PMU优化配置方法综述
相量测量单元(PMU)是当前电力系统监测、保护和控制的重要组成部分。对于当前的电力系统,pmu不仅提供同步测量电压的实时数据,还提供同步测量电流和频率的实时数据。从经济角度和大数据处理的角度来看,在每条总线上放置pmu来监控系统是不可行的。因此,减少母线系统中pmu的数量以达到系统的最大功率观测是势在必行的。从过去到现在,不同的技术被应用于解决这一最佳PMU放置(OPP)问题,如启发式方法,数学规划。启发式方法是一种基于经验的快速求解优化问题的方法。本文综述了解决OPP问题的各种优化方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信