A Novel Class of Scheduling Policies for the Stochastic Resource-Constrained Project Scheduling Problem

B. Ashtiani, R. Leus, M. Aryanezhad
{"title":"A Novel Class of Scheduling Policies for the Stochastic Resource-Constrained Project Scheduling Problem","authors":"B. Ashtiani, R. Leus, M. Aryanezhad","doi":"10.2139/ssrn.1368714","DOIUrl":null,"url":null,"abstract":"We study the resource-constrained project scheduling problem with stochastic activity durations. We introduce a new class of scheduling policies for this problem, which make a number of a-priori sequencing decisions in a pre-processing phase, while the remaining decisions are made dynamically during project execution. The pre-processing decisions entail the addition of precedence constraints to the scheduling instance, hereby resolving some potential resource conflicts. We compare the performance of this new class with existing scheduling policies for the stochastic resource-constrained project scheduling problem, and we observe that the new class is significantly better when the variability in the activity durations is medium to high.","PeriodicalId":400873,"journal":{"name":"Microeconomics: Information","volume":"207 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Microeconomics: Information","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1368714","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

We study the resource-constrained project scheduling problem with stochastic activity durations. We introduce a new class of scheduling policies for this problem, which make a number of a-priori sequencing decisions in a pre-processing phase, while the remaining decisions are made dynamically during project execution. The pre-processing decisions entail the addition of precedence constraints to the scheduling instance, hereby resolving some potential resource conflicts. We compare the performance of this new class with existing scheduling policies for the stochastic resource-constrained project scheduling problem, and we observe that the new class is significantly better when the variability in the activity durations is medium to high.
一类新的随机资源约束项目调度策略
研究了具有随机活动时间的资源约束项目调度问题。针对这一问题,我们引入了一类新的调度策略,该策略在预处理阶段做出许多先验排序决策,而其余决策在项目执行期间动态做出。预处理决策需要在调度实例中添加优先约束,从而解决一些潜在的资源冲突。针对随机资源约束项目调度问题,我们将新类与现有调度策略的性能进行了比较,我们观察到,当活动持续时间的可变性为中到高时,新类的性能明显更好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信