Ecological and Economic Aspects of Phosphogypsum Safety Management at the Former Uranium Production Site “Pridniproivsky Chemical Plant”

36 Pub Date : 2021-12-29 DOI:10.26565/1992-4224-2021-36-08
K. Korychenskyi, T. Lavrova, O. Voitsekhovych
{"title":"Ecological and Economic Aspects of Phosphogypsum Safety Management at the Former Uranium Production Site “Pridniproivsky Chemical Plant”","authors":"K. Korychenskyi, T. Lavrova, O. Voitsekhovych","doi":"10.26565/1992-4224-2021-36-08","DOIUrl":null,"url":null,"abstract":"Purpose: Justification the possibility of safe re-use and recycling of the residues of Uranium-containing raw material processing as an element of the remediation strategy for bringing the site of the former \"Prydniprovsky Chemical Plant\" (PChP)to a safe state.\n\nMethods: Site specific field studies and analytical methods for determining of the radionuclides of Uranium-Thorium series, as well as useful mineral elements in the residues of Uranium production, assessment of safe management and possible options for its re-use and recycling.\n\nResults: According to the results of monitoring studies on the radionuclide and hydrochemical composition of groundwater at the PChP industrial site for the period from 2009 to 2021 year, a high content of sulfates and an increased content of uranium in groundwater under the body of the Dniprovske tailing dump, which has a phosphogypsum coating on its surface, was revealed. Phosphogypsum is considered, on the one hand, as a source of groundwater pollution, and on the other, as a potential resource for its possible reuse and processing. The results of experimental studies of the content of natural radionuclides and the elemental composition of mineral residues of ore production at the site of the former uranium ore processing plant \"PChP\" are also provided, as well as an safety assessment of their handling and the options of their possible processing as an element of the strategy for bringing the site to a safe state.\n\nConclusions: The possibility and necessity of safe processing of phosphogypsum on the surface of the tailings \"Dniprovske\" with its simultaneous replacement by a new soil cover is proved.","PeriodicalId":166012,"journal":{"name":"36","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"36","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26565/1992-4224-2021-36-08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Purpose: Justification the possibility of safe re-use and recycling of the residues of Uranium-containing raw material processing as an element of the remediation strategy for bringing the site of the former "Prydniprovsky Chemical Plant" (PChP)to a safe state. Methods: Site specific field studies and analytical methods for determining of the radionuclides of Uranium-Thorium series, as well as useful mineral elements in the residues of Uranium production, assessment of safe management and possible options for its re-use and recycling. Results: According to the results of monitoring studies on the radionuclide and hydrochemical composition of groundwater at the PChP industrial site for the period from 2009 to 2021 year, a high content of sulfates and an increased content of uranium in groundwater under the body of the Dniprovske tailing dump, which has a phosphogypsum coating on its surface, was revealed. Phosphogypsum is considered, on the one hand, as a source of groundwater pollution, and on the other, as a potential resource for its possible reuse and processing. The results of experimental studies of the content of natural radionuclides and the elemental composition of mineral residues of ore production at the site of the former uranium ore processing plant "PChP" are also provided, as well as an safety assessment of their handling and the options of their possible processing as an element of the strategy for bringing the site to a safe state. Conclusions: The possibility and necessity of safe processing of phosphogypsum on the surface of the tailings "Dniprovske" with its simultaneous replacement by a new soil cover is proved.
原铀生产基地“普里季普罗夫斯基化工厂”磷石膏安全管理的生态经济意义
目的:证明安全再利用和再循环含铀原料加工残留物的可能性,作为将前“普里德尼普罗斯基化工厂”(PChP)场址恢复到安全状态的补救战略的一个要素。方法:特定场址的实地研究和分析方法,以确定铀-钍系列的放射性核素以及铀生产残留物中的有用矿物元素,评估安全管理及其再使用和再循环的可能选择。结果:根据2009 - 2021年PChP工业场地地下水放射性核素和水化学成分监测研究结果,Dniprovske尾矿库体下地下水硫酸盐含量高,铀含量增加,表面有磷石膏涂层。磷石膏一方面被认为是地下水污染的来源,另一方面被认为是一种潜在的资源,可以再利用和加工。还提供了对前铀矿石加工厂“PChP”场址的天然放射性核素含量和矿石生产矿物残留物元素组成的实验研究结果,以及对其处理的安全评估和可能处理的备选办法,作为使该场址达到安全状态的战略的一个组成部分。结论:证明了在“大尼普罗斯克”尾砂表面安全处理磷石膏并同时进行新覆盖层置换的可能性和必要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
36
36
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信