S. Arima, Huizhen Bu, Yutaka Akiyama, Hiroyuki Motomiya
{"title":"Real-Time resource allocations and shceduling of product-mix production systems with multi-type jigs","authors":"S. Arima, Huizhen Bu, Yutaka Akiyama, Hiroyuki Motomiya","doi":"10.23919/ISSM.2017.8089104","DOIUrl":null,"url":null,"abstract":"This paper introduces an integration method for a multi-type resource allocation problem (MRAP) and Product-mix scheduling problems (PMSPs) in real-time. Particularly, SAR2 (Simultaneous Allocation based on Resource-Ratio) is used as high-speed heuristic approach for the MRAP, and an real-time scheduling method using optimal production cycle (OPC) is used in the scheduling to maximize the resource utilization while keeping a due date and Q-time restrictions of every production lot. As the result of performance evaluations in an actual wafer test process, the proposed method improved both the due-date satisfaction by 24.4–26.2% and standard deviation of tool utilization by 13–16%. The computational time was short enough for a real-time control even by using a standard personal computer.","PeriodicalId":280728,"journal":{"name":"2017 Joint International Symposium on e-Manufacturing and Design Collaboration (eMDC) & Semiconductor Manufacturing (ISSM)","volume":"126 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Joint International Symposium on e-Manufacturing and Design Collaboration (eMDC) & Semiconductor Manufacturing (ISSM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/ISSM.2017.8089104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper introduces an integration method for a multi-type resource allocation problem (MRAP) and Product-mix scheduling problems (PMSPs) in real-time. Particularly, SAR2 (Simultaneous Allocation based on Resource-Ratio) is used as high-speed heuristic approach for the MRAP, and an real-time scheduling method using optimal production cycle (OPC) is used in the scheduling to maximize the resource utilization while keeping a due date and Q-time restrictions of every production lot. As the result of performance evaluations in an actual wafer test process, the proposed method improved both the due-date satisfaction by 24.4–26.2% and standard deviation of tool utilization by 13–16%. The computational time was short enough for a real-time control even by using a standard personal computer.