PERENCANAAN ULANG SISTEM DRAINASE DAN IPAL DI JALAN SIMPANG BANDULAN BARAT - JALAN BRIGJEND KATAMSO KOTA MALANG

Alda Alda, Winda Harsanti, S. Sutikno
{"title":"PERENCANAAN ULANG SISTEM DRAINASE DAN IPAL DI JALAN SIMPANG BANDULAN BARAT - JALAN BRIGJEND KATAMSO KOTA MALANG","authors":"Alda Alda, Winda Harsanti, S. Sutikno","doi":"10.55404/jos-mrk.2021.02.03.8-12","DOIUrl":null,"url":null,"abstract":"On West Bandulan Junction Street - Brigjend Katamso Street, Malang City often experiences inundation during the rainy season. The occurrence of flooding is caused by the capacity of the drainage channel which is not sufficient to accommodate the discharge of runoff, improper drainage planning garbage in the drainage channel, the amount of waste from households and industry and the large number of closed drainage channels because it is made for parking and community home yards . From this condition, the drainage re-design is carried out. This plan is made to re-design the dimensions of the drainage channels and calculate the WWTP (Wastewater Treatment Plant) requirements, as well as calculate the RAB. The results of the calculation of the planned channel dimensions are trapezoidal and square with the largest dimensions of the trapezoid having a width of 1.19 m, a bottom width of 0.8 m and a height of 1.09 m. while the largest dimension of a square has a width of 1.4 m and a height of 1.4 m. The results of the calculation of the need for WWTP require 4 WWTP with different capacities, namely IPAL 1 with a capacity of 4 m3, IPAL 2 with a capacity of 12 m3, IPAL 3 with a capacity of 3 m3, IPAL 2 with a capacity of 2 m3. Based on the results of the calculation of drainage redesign, it can be concluded that the cost of redesign the drainage and WWTP is Rp. 6,473,335,422.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.8-12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

On West Bandulan Junction Street - Brigjend Katamso Street, Malang City often experiences inundation during the rainy season. The occurrence of flooding is caused by the capacity of the drainage channel which is not sufficient to accommodate the discharge of runoff, improper drainage planning garbage in the drainage channel, the amount of waste from households and industry and the large number of closed drainage channels because it is made for parking and community home yards . From this condition, the drainage re-design is carried out. This plan is made to re-design the dimensions of the drainage channels and calculate the WWTP (Wastewater Treatment Plant) requirements, as well as calculate the RAB. The results of the calculation of the planned channel dimensions are trapezoidal and square with the largest dimensions of the trapezoid having a width of 1.19 m, a bottom width of 0.8 m and a height of 1.09 m. while the largest dimension of a square has a width of 1.4 m and a height of 1.4 m. The results of the calculation of the need for WWTP require 4 WWTP with different capacities, namely IPAL 1 with a capacity of 4 m3, IPAL 2 with a capacity of 12 m3, IPAL 3 with a capacity of 3 m3, IPAL 2 with a capacity of 2 m3. Based on the results of the calculation of drainage redesign, it can be concluded that the cost of redesign the drainage and WWTP is Rp. 6,473,335,422.
在西班都兰汇合街-布里吉德卡塔姆索街,玛琅市经常在雨季经历洪水。洪水的发生是由于排水渠道的容量不足以容纳径流的排放,排水规划不当,排水渠道中的垃圾,家庭和工业的废物量,以及大量封闭的排水渠道,因为它是为停车场和社区家庭庭院而建造的。在此基础上,进行了排水重新设计。本方案是为了重新设计排水通道的尺寸,计算污水处理厂的需求,以及计算RAB。规划河道尺寸计算结果为梯形和方形,梯形的最大尺寸宽1.19 m,底宽0.8 m,高1.09 m,方形的最大尺寸宽1.4 m,高1.4 m。污水处理量的计算结果需要4个不同容量的污水处理池,即IPAL 1容量为4 m3, IPAL 2容量为12 m3, IPAL 3容量为3 m3, IPAL 2容量为2 m3。根据排水重新设计的计算结果,可以得出排水和污水处理重新设计的成本为Rp. 6,473,335,422。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信