PENGENDALIAN WAKTU PELAKSANAAN PROJECT DENGAN MENGGUNAKAN EARNED VALUE CONCEPT

Felix Setiawan, Maulana Ihsan
{"title":"PENGENDALIAN WAKTU PELAKSANAAN PROJECT DENGAN MENGGUNAKAN EARNED VALUE CONCEPT","authors":"Felix Setiawan, Maulana Ihsan","doi":"10.51988/jtsc.v4i1.125","DOIUrl":null,"url":null,"abstract":"The success of a project is a series of activities that include the stages of planning, implementation and supervision, so that the goals that have been set can be achieved and implemented. Therefore, it is necessary to carry out supervision and control measures in various sectors, especially time control. The method used in this study is the Earn Value Concept method. This research was conducted, with the aim of knowing the performance of the project, problems occurring and solutions to these problems. The data used are in the form of an S curve, RAB, and weekly progress reports. From these data obtained the results of BCWS and BCWP, with the help of Microsoft Excel programs set SV, SPI values, as well as predicting the final time of the project (ETC and EAC).","PeriodicalId":282558,"journal":{"name":"JURNAL TEKNIK SIPIL CENDEKIA (JTSC)","volume":"197 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL TEKNIK SIPIL CENDEKIA (JTSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51988/jtsc.v4i1.125","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The success of a project is a series of activities that include the stages of planning, implementation and supervision, so that the goals that have been set can be achieved and implemented. Therefore, it is necessary to carry out supervision and control measures in various sectors, especially time control. The method used in this study is the Earn Value Concept method. This research was conducted, with the aim of knowing the performance of the project, problems occurring and solutions to these problems. The data used are in the form of an S curve, RAB, and weekly progress reports. From these data obtained the results of BCWS and BCWP, with the help of Microsoft Excel programs set SV, SPI values, as well as predicting the final time of the project (ETC and EAC).
一个项目的成功是一系列的活动,包括计划、实施和监督的阶段,使已经设定的目标能够实现和实施。因此,有必要在各个环节实施监督和控制措施,特别是时间控制。本研究使用的方法是赚取价值概念法。进行这项研究的目的是了解项目的绩效,出现的问题和解决这些问题的方法。使用的数据采用S曲线、RAB和每周进度报告的形式。从这些数据中得到BCWS和BCWP的结果,借助Microsoft Excel程序设置SV、SPI值,以及预测项目的最终时间(ETC和EAC)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信