公有建築物繳交建築資訊建模(BIM)竣工模型之建材與設備交付資訊內容研究

黃毓舜 黃毓舜, 施宣光 Yu-Shun Huang, 黃立德 Shen-Guan Shih
{"title":"公有建築物繳交建築資訊建模(BIM)竣工模型之建材與設備交付資訊內容研究","authors":"黃毓舜 黃毓舜, 施宣光 Yu-Shun Huang, 黃立德 Shen-Guan Shih","doi":"10.53106/101632122021030115008","DOIUrl":null,"url":null,"abstract":"\n 目前國內有關建築資訊塑模(Building Information Modeling, 簡稱BIM)與維運需求項目並沒有產生直接對應。根據國外文獻整理,有關建築物維運管理(Facilities Management,簡稱FM)目前常用的標準如ISO55000(2014)、ISO 19650、BS1192-4(2014)、與共同資料環境(Common Data Environment,簡稱CDE)與營建資訊的交付標準(Construction Operations Building Information Exchange,簡稱COBie)等。本研究提出建築物的維運資料架構與系統建立流程,它包含BIM模型建置、IFC資料轉檔、共同資料庫建立與建築物維運系統的發展四個階段。隨著施工過程中,逐步建立BIM竣工模型的建材與設備資料,才能達成以建築物生命週期履歷落實標準化維運管理的目標。本計畫以內政部營建署執行中的三個代辦工程討論竣工模型之建材與設備交付資訊項目。目的是協助公部門工程主辦機關從施工階段的BIM執行契約可延伸到竣工階段的維運資料。本研究的成果將提供一個通用的維運資料架構與系統雛形,協助政府部門可用於執行BIM契約資料交付。\n The data translation between Building Information Modeling(BIM) and Facilities Management(FM) has not been built an automatic mechanism in Taiwan currently. According to the literature review, the standards related to building FM include ISO55000 (2014), ISO 19650, BS1192-4 (2014), Common Data Environment (CDE), and Construction Operations Building Information Exchange, (COBie). The thesis proposes a framework and data delivery process for building maintenance data translation. The process includes four stages of BIM model data input, IFC data export, CDE database, and FM system development. With the construction process, the materials and equipment data will be embedded into the completion model. The completion model will assist to achieve the goal of implementing standardized maintenance management on the building life cycle. The thesis discusses the building materials and equipment delivery information of the completed model with three public-work cases by Construction and Planning Agency, Ministry of the Interior. The purpose is to assist the BIM model data can link the construction to the maintenance and operation stage. The results will provide a general data requirement table system porotype that can assist the government departments to execute BIM contracts. \n \n","PeriodicalId":291191,"journal":{"name":"建築學報","volume":"113 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"建築學報","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53106/101632122021030115008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

目前國內有關建築資訊塑模(Building Information Modeling, 簡稱BIM)與維運需求項目並沒有產生直接對應。根據國外文獻整理,有關建築物維運管理(Facilities Management,簡稱FM)目前常用的標準如ISO55000(2014)、ISO 19650、BS1192-4(2014)、與共同資料環境(Common Data Environment,簡稱CDE)與營建資訊的交付標準(Construction Operations Building Information Exchange,簡稱COBie)等。本研究提出建築物的維運資料架構與系統建立流程,它包含BIM模型建置、IFC資料轉檔、共同資料庫建立與建築物維運系統的發展四個階段。隨著施工過程中,逐步建立BIM竣工模型的建材與設備資料,才能達成以建築物生命週期履歷落實標準化維運管理的目標。本計畫以內政部營建署執行中的三個代辦工程討論竣工模型之建材與設備交付資訊項目。目的是協助公部門工程主辦機關從施工階段的BIM執行契約可延伸到竣工階段的維運資料。本研究的成果將提供一個通用的維運資料架構與系統雛形,協助政府部門可用於執行BIM契約資料交付。  The data translation between Building Information Modeling(BIM) and Facilities Management(FM) has not been built an automatic mechanism in Taiwan currently. According to the literature review, the standards related to building FM include ISO55000 (2014), ISO 19650, BS1192-4 (2014), Common Data Environment (CDE), and Construction Operations Building Information Exchange, (COBie). The thesis proposes a framework and data delivery process for building maintenance data translation. The process includes four stages of BIM model data input, IFC data export, CDE database, and FM system development. With the construction process, the materials and equipment data will be embedded into the completion model. The completion model will assist to achieve the goal of implementing standardized maintenance management on the building life cycle. The thesis discusses the building materials and equipment delivery information of the completed model with three public-work cases by Construction and Planning Agency, Ministry of the Interior. The purpose is to assist the BIM model data can link the construction to the maintenance and operation stage. The results will provide a general data requirement table system porotype that can assist the government departments to execute BIM contracts.  
公有建筑物缴交建筑资讯建模(BIM)竣工模型之建材与设备交付资讯内容研究
目前国内有关建筑资讯塑模(Building Information Modeling, 简称BIM)与维运需求项目并没有产生直接对应。根据国外文献整理,有关建筑物维运管理(Facilities Management,简称FM)目前常用的标准如ISO55000(2014)、ISO 19650、BS1192-4(2014)、与共同资料环境(Common Data Environment,简称CDE)与营建资讯的交付标准(Construction Operations Building Information Exchange,简称COBie)等。本研究提出建筑物的维运资料架构与系统建立流程,它包含BIM模型建置、IFC资料转档、共同资料库建立与建筑物维运系统的发展四个阶段。随著施工过程中,逐步建立BIM竣工模型的建材与设备资料,才能达成以建筑物生命周期履历落实标准化维运管理的目标。本计划以内政部营建署执行中的三个代办工程讨论竣工模型之建材与设备交付资讯项目。目的是协助公部门工程主办机关从施工阶段的BIM执行契约可延伸到竣工阶段的维运资料。本研究的成果将提供一个通用的维运资料架构与系统雏形,协助政府部门可用于执行BIM契约资料交付。 The data translation between Building Information Modeling(BIM) and Facilities Management(FM) has not been built an automatic mechanism in Taiwan currently. According to the literature review, the standards related to building FM include ISO55000 (2014), ISO 19650, BS1192-4 (2014), Common Data Environment (CDE), and Construction Operations Building Information Exchange, (COBie). The thesis proposes a framework and data delivery process for building maintenance data translation. The process includes four stages of BIM model data input, IFC data export, CDE database, and FM system development. With the construction process, the materials and equipment data will be embedded into the completion model. The completion model will assist to achieve the goal of implementing standardized maintenance management on the building life cycle. The thesis discusses the building materials and equipment delivery information of the completed model with three public-work cases by Construction and Planning Agency, Ministry of the Interior. The purpose is to assist the BIM model data can link the construction to the maintenance and operation stage. The results will provide a general data requirement table system porotype that can assist the government departments to execute BIM contracts.
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信