Investment Project Analysis of Mud Handling Using Slurry Pump Method: A Case Study of Pit C2 PT. Berau Coal

{"title":"Investment Project Analysis of Mud Handling Using Slurry Pump Method: A Case Study of Pit C2 PT. Berau Coal","authors":"","doi":"10.55057/ijbtm.2022.4.4.12","DOIUrl":null,"url":null,"abstract":"Disposal is important in mining activity for allocation of waste material that need to be dispose to obtain the coal ores. The disposal allocation in Pit C2 currently has a long distance and there is an additional cost incurred due to the distance rate adjustment from distance contract reference. To overcome this problem, there is an option of short distance disposal scenario, namely in pit dump scenario. With this scenario, there is cost efficiency from the distance rate adjustment due to the reduction in disposal distance. Sump H as a planned area for in pit dump is currently fulfilled with sedimentation material, with a volume around 1,2 million cubic meters (BCM). Therefore, it is necessary for mud handling in Sump H area for it to become in pit dump location area. One of the proposed scenarios is the use of slurry pump, this scenario is more suitable for current condition due to it can finished earlier. However, it is necessary to study and evaluate further the financial analysis of the proposed scenario in comprehensive manner. To obtain the financial feasibility of this project, this research use capital budgeting analysis in which the parameters used are studied further using sensitivity analysis and probability analysis. From the results of the financial feasibility analysis of this slurry pump scenario, it shows that this project is financially feasible with an NPV value of IDR 16.227.951.215,26, with an IRR of 43,08%, a Payback Period of 1,6 years, a Discounted Payback Period of 1,77 years and a Profitability value Index 1,7. In addition, based on the Monte Carlo Simulation for probability analysis, it is found that the probability of this project failing is 0%. Therefore, it can be concluded from the results of the financial feasibility analysis, this project is recommended to be implemented.","PeriodicalId":253813,"journal":{"name":"International Journal of Business and Technology Management","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Business and Technology Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55057/ijbtm.2022.4.4.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Disposal is important in mining activity for allocation of waste material that need to be dispose to obtain the coal ores. The disposal allocation in Pit C2 currently has a long distance and there is an additional cost incurred due to the distance rate adjustment from distance contract reference. To overcome this problem, there is an option of short distance disposal scenario, namely in pit dump scenario. With this scenario, there is cost efficiency from the distance rate adjustment due to the reduction in disposal distance. Sump H as a planned area for in pit dump is currently fulfilled with sedimentation material, with a volume around 1,2 million cubic meters (BCM). Therefore, it is necessary for mud handling in Sump H area for it to become in pit dump location area. One of the proposed scenarios is the use of slurry pump, this scenario is more suitable for current condition due to it can finished earlier. However, it is necessary to study and evaluate further the financial analysis of the proposed scenario in comprehensive manner. To obtain the financial feasibility of this project, this research use capital budgeting analysis in which the parameters used are studied further using sensitivity analysis and probability analysis. From the results of the financial feasibility analysis of this slurry pump scenario, it shows that this project is financially feasible with an NPV value of IDR 16.227.951.215,26, with an IRR of 43,08%, a Payback Period of 1,6 years, a Discounted Payback Period of 1,77 years and a Profitability value Index 1,7. In addition, based on the Monte Carlo Simulation for probability analysis, it is found that the probability of this project failing is 0%. Therefore, it can be concluded from the results of the financial feasibility analysis, this project is recommended to be implemented.
矿浆泵法处理泥浆的投资项目分析——以柏劳煤矿C2坑为例
在采矿活动中,处置是重要的,用于分配需要处置的废料,以获得煤炭矿石。C2坑的处置分配目前距离较长,由于距离合同参考的距离费率调整,产生了额外的费用。为了克服这一问题,有一种就近处置方案的选择,即垃圾场方案。在这种情况下,由于处理距离的减少,从距离率调整中获得了成本效率。H坑作为排土场的规划区域,目前已填入沉降物料,体积约为120万立方米。因此,有必要在H坑区进行泥浆处理,使其成为排土场定位区域。提出的方案之一是使用浆料泵,该方案由于可以较早完成,因此更适合目前的情况。但是,有必要进一步全面地研究和评价拟议方案的财务分析。为了获得该项目的财务可行性,本研究采用了资本预算分析,并利用敏感性分析和概率分析对所使用的参数进行了进一步研究。从该浆泵方案的财务可行性分析结果来看,该项目财务可行性,净现值为16.227.951.215,内部收益率为43,08%,投资回收期为1,6年,贴现回收期为1,77年,盈利能力价值指数为1,7。此外,通过蒙特卡罗模拟进行概率分析,发现该项目失败的概率为0%。因此,从财务可行性分析的结果可以得出结论,建议实施本项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信