Reduksi Waste untuk Meningkatkan Produktivitas pada Proses Produksi Bracket Roulet Gordyn Menggunakan Pendekatan Lean Manufacturing

Arief Rahman Somantri, Endang Prasetyaningsih, Chaznin R. Muhammad
{"title":"Reduksi Waste untuk Meningkatkan Produktivitas pada Proses Produksi Bracket Roulet Gordyn Menggunakan Pendekatan Lean Manufacturing","authors":"Arief Rahman Somantri, Endang Prasetyaningsih, Chaznin R. Muhammad","doi":"10.29313/TI.V0I0.30682","DOIUrl":null,"url":null,"abstract":"Abstract. CV. UM is a manufacturing industry that produces Bracket Roulet Gordyn.  In running its business, CV. UM often experience delays in fulfilling customer requests. Factors that cause this problem is because of the amount of waste activity, thus making production lead time become long and productivity levels decrease. When productivity decreases, it affects the speed of customer demand fulfillment. Therefore, Lean Manufacturing approach can be used as an effort to reduce waste. This study aims to reduce waste so that the productivity of CV. UM is increasing. Based on the results of waste identification using Value Stream Mapping (VSM), and 7 waste questionnaire, it is known that there are 4 types of dominant waste that inhibit the production flow, namely Excessive Transportation, Waiting, Unnecessary Motion, and Unnecessary Inventory. To solve this problem, improvement efforts are proposed by applying the design of tools in the form of Roll Conveyor, pulley systems, containers, and crocks, application of the concept of 5S, production layout redesign, the addition of facilities that support the production process in the form of Trolley Pallet Jack and Wooden Pallet, and the application of Lean Thinking. If improvement efforts to reduce waste are implemented, production lead time is expected to be reduced by 19% from 20.007,04 seconds to 16.175,04 seconds. The decrease can increase Process Cycle Efficiency (PCE) or company productivity = increased by 13,43% from 52,47% to 66,17%. \nAbstrak. CV. UM merupakan industri manufaktur yang memproduksi Bracket Roulet Gordyn. Dalam menjalankan bisnisnya, CV. UM sering mengalami keterlambatan dalam memenuhi permintaan pelanggan. Faktor yang menyebabkan hal tersebut yaitu banyaknya aktivitas pemborosan (waste), sehingga membuat production lead time menjadi panjang dan tingkat produktivitas menurun. Ketika produktivitas menurun, maka akan mempengaruhi kecepatan pemenuhan permintaan pelanggan. Oleh karena itu, pendekataan Lean Manufacturing dapat dimanfaatkan sebagai upaya untuk mereduksi waste. Penelitian ini bertujuan untuk mereduksi waste agar produktivitas CV. UM meningkat. Berdasarkan hasil identifikasi waste menggunakan Value Stream Mapping (VSM) dan kuesioner 7 waste, diketahui bahwa terdapat 4 jenis waste dominan yang menghambat aliran produksi yaitu Excessive Transportation, Waiting, Unnecessary Motion, dan Unnecessary Inventory. Untuk mengatasi masalah tersebut, diusulkan upaya perbaikan dengan menerapkan rancangan alat bantu berupa Roll Conveyor, sistem katrol, kontainer, dan wadah, penerapan konsep 5S, perancangan ulang layout produksi, penambahan fasilitas pendukung proses produksi berupa Trolley Pallet Jack beserta Wooden Pallet, dan penerapan Lean Thinking. Apabila upaya perbaikan untuk mereduksi waste diterapkan, diharapkan production lead time berkurang sebesar 19% dari 20.007,04 detik menjadi 16.175,04 detik. Penurunan tersebut dapat meningkatkan Process Cycle Efficiency (PCE) atau produktivitas perusahaan = sebesar 13,43% dari 52,47% menjadi 66,17%.","PeriodicalId":276819,"journal":{"name":"Jurnal Riset Teknik Industri","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Riset Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/TI.V0I0.30682","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract. CV. UM is a manufacturing industry that produces Bracket Roulet Gordyn.  In running its business, CV. UM often experience delays in fulfilling customer requests. Factors that cause this problem is because of the amount of waste activity, thus making production lead time become long and productivity levels decrease. When productivity decreases, it affects the speed of customer demand fulfillment. Therefore, Lean Manufacturing approach can be used as an effort to reduce waste. This study aims to reduce waste so that the productivity of CV. UM is increasing. Based on the results of waste identification using Value Stream Mapping (VSM), and 7 waste questionnaire, it is known that there are 4 types of dominant waste that inhibit the production flow, namely Excessive Transportation, Waiting, Unnecessary Motion, and Unnecessary Inventory. To solve this problem, improvement efforts are proposed by applying the design of tools in the form of Roll Conveyor, pulley systems, containers, and crocks, application of the concept of 5S, production layout redesign, the addition of facilities that support the production process in the form of Trolley Pallet Jack and Wooden Pallet, and the application of Lean Thinking. If improvement efforts to reduce waste are implemented, production lead time is expected to be reduced by 19% from 20.007,04 seconds to 16.175,04 seconds. The decrease can increase Process Cycle Efficiency (PCE) or company productivity = increased by 13,43% from 52,47% to 66,17%. Abstrak. CV. UM merupakan industri manufaktur yang memproduksi Bracket Roulet Gordyn. Dalam menjalankan bisnisnya, CV. UM sering mengalami keterlambatan dalam memenuhi permintaan pelanggan. Faktor yang menyebabkan hal tersebut yaitu banyaknya aktivitas pemborosan (waste), sehingga membuat production lead time menjadi panjang dan tingkat produktivitas menurun. Ketika produktivitas menurun, maka akan mempengaruhi kecepatan pemenuhan permintaan pelanggan. Oleh karena itu, pendekataan Lean Manufacturing dapat dimanfaatkan sebagai upaya untuk mereduksi waste. Penelitian ini bertujuan untuk mereduksi waste agar produktivitas CV. UM meningkat. Berdasarkan hasil identifikasi waste menggunakan Value Stream Mapping (VSM) dan kuesioner 7 waste, diketahui bahwa terdapat 4 jenis waste dominan yang menghambat aliran produksi yaitu Excessive Transportation, Waiting, Unnecessary Motion, dan Unnecessary Inventory. Untuk mengatasi masalah tersebut, diusulkan upaya perbaikan dengan menerapkan rancangan alat bantu berupa Roll Conveyor, sistem katrol, kontainer, dan wadah, penerapan konsep 5S, perancangan ulang layout produksi, penambahan fasilitas pendukung proses produksi berupa Trolley Pallet Jack beserta Wooden Pallet, dan penerapan Lean Thinking. Apabila upaya perbaikan untuk mereduksi waste diterapkan, diharapkan production lead time berkurang sebesar 19% dari 20.007,04 detik menjadi 16.175,04 detik. Penurunan tersebut dapat meningkatkan Process Cycle Efficiency (PCE) atau produktivitas perusahaan = sebesar 13,43% dari 52,47% menjadi 66,17%.
利用精益制造方法提高菌根Roulet Gordyn生产过程的生产力
摘要简历。UM是一个制造行业,生产支架轮盘Gordyn。在经营业务方面,CV。UM在满足客户要求方面经常遇到延迟。造成这一问题的因素是由于大量的浪费活动,从而使生产前置时间变长,生产力水平下降。当生产力下降时,它会影响客户需求实现的速度。因此,精益生产方法可以作为减少浪费的一种努力。本研究旨在减少浪费,提高CV的生产效率。UM正在增加。根据价值流图(Value Stream Mapping, VSM)的废物识别结果和7份废物调查问卷可知,抑制生产流程的主要废物类型有4种,分别是:过度运输、等待、不必要的运动和不必要的库存。为了解决这一问题,提出了改进措施,包括采用辊道输送机、滑轮系统、集装箱和瓦罐形式的工具设计,应用5S概念,重新设计生产布局,增加手推车托盘千斤顶和木制托盘形式的生产支持设施,以及应用精益思维。如果采取改进措施减少浪费,预计生产交货期将减少19%,从20.007 . 04秒减少到16.175 . 04秒。减少可以增加过程周期效率(PCE)或公司生产力=增加13.43%,从52,47%到66,17%。Abstrak。简历。ummerupakan工业制造杨氏支架产品。Dalam menjalankan bisnisnya, CV。UM服务于门加拉米keterlambatan dalam纪念物,permintaan pelanggan。fakto yang menyebabkan hal tersebut yitu banyaknya aktivitas pemborosan(废物),seingga memu生产提前时间menjadi panjang dantingkat producktivitas menurun。Ketika producktivitas menurun, maka akan mempengaruhi keecepatan pemenuhan permintaan pelanggan。精益生产,精益生产,精益生产,精益生产,精益生产,精益生产,精益生产废琼脂生产活性研究。嗯meningkat。Berdasarkan hasil识别kasi废物,menggunakan价值流图(VSM), dankuesioner 7废物,diketahui bahawa terdapat 4 jenis废物,dominan yang menghambat aliran产品过度运输,等待,不必要的运动,和不必要的库存。Untuk mengatasi masalah tersebut, diusulkan upaya perbaikan dengan,集装箱,dan wadah, penanangan konsep 5S, perancangan ulang布局产品,penambahan fasilitas pendukung加工产品,peranangan berupa手推车托盘Jack berserta木托盘,danpenerapan精益思维。Apabila upaya perbaikan untuk mereduksi waste diiterapkan, diharapkan生产提前期berkurang sebesar 19% dari 20.007, 2004 detik menjadi 16.175, 2004 detik。工艺循环效率(PCE)与生产效率的比值分别为:1、13、43%、52、47%、66、17%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信