{"title":"Backward assembly planning with assembly cost analysis","authors":"Sukhan Lee","doi":"10.1109/ROBOT.1992.220107","DOIUrl":null,"url":null,"abstract":"The author considers automatic assembly planning by developing a backward assembly planner which handles the case where an assembly sequence is not the same as the reverse of a disassembly sequence; improving planning efficiency with the reduction of search space by merging and grouping parts based on interconnection feasibility and special process precedence constraints; establishing assembly process planning by incorporating such special processes as testing, cleaning, etc., in assembly planning; and providing subassembly evaluation criteria with a direct connection to assembly cost. A method for the stability and directionality of an assembly is presented through which the required number of holding devices and reorientations during assembly are identified.<<ETX>>","PeriodicalId":307394,"journal":{"name":"Proceedings 1992 IEEE International Conference on Robotics and Automation","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"58","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1992 IEEE International Conference on Robotics and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROBOT.1992.220107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 58
Abstract
The author considers automatic assembly planning by developing a backward assembly planner which handles the case where an assembly sequence is not the same as the reverse of a disassembly sequence; improving planning efficiency with the reduction of search space by merging and grouping parts based on interconnection feasibility and special process precedence constraints; establishing assembly process planning by incorporating such special processes as testing, cleaning, etc., in assembly planning; and providing subassembly evaluation criteria with a direct connection to assembly cost. A method for the stability and directionality of an assembly is presented through which the required number of holding devices and reorientations during assembly are identified.<>