{"title":"Integrated scheduling in ready mixed concrete plant with multi-mixer","authors":"Yakun Zhang, Hua Guo","doi":"10.1109/LISS.2015.7369721","DOIUrl":null,"url":null,"abstract":"In this study, an integrated programming model in ready mixed concrete plant with multi-mixer is developed, which is based on the research of a real company's business process and logistics management. A method is proposed which applies a combining-rules algorithm including the rules for choosing mixers, trucks and construction sites. On the basis of computational experiments on a variety of real cases, some conclusions are drawn which can provide a better solution for a scheduling manager.","PeriodicalId":124091,"journal":{"name":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LISS.2015.7369721","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
In this study, an integrated programming model in ready mixed concrete plant with multi-mixer is developed, which is based on the research of a real company's business process and logistics management. A method is proposed which applies a combining-rules algorithm including the rules for choosing mixers, trucks and construction sites. On the basis of computational experiments on a variety of real cases, some conclusions are drawn which can provide a better solution for a scheduling manager.