Management and engineering solutions for railway station development

BRIСS Transport Pub Date : 2023-04-14 DOI:10.46684/2023.1.5
A. V. Kabanov, O. A. Marshavina
{"title":"Management and engineering solutions for railway station development","authors":"A. V. Kabanov, O. A. Marshavina","doi":"10.46684/2023.1.5","DOIUrl":null,"url":null,"abstract":"This paper presents a methodology for construction engineering management of railway station redevelopment. The station working capacity is taken into account and the stages of preliminary and main works are determined. The scope of work to be performed by a building contractor is substantiated to provide an optimal station performance. The volume and scopes of work for specific and complex construction workflows are grouped by the components of the railway marshalling yard.The optimal volume of work of the complex flow F has been determined (as a percentage of the total estimated cost of the facility). The station working capacity Nв has been taken into consideration in correlation with the given conditions of construction or renovation works.The key construction flow management options have been worked out based on the optimal index of construction work sequence, prime cost reduction of construction and installation works (current costs C), and effective capital investments into machines and mechanisms (one-time costs Кf).The proposed methodology for construction management and engineering solutions is oriented to general contracting and subcontracting companies of the railway construction sector. This methodology is intended to lower the prime cost of construction and installation works and to reduce the time of construction and redevelopment of railway stations.","PeriodicalId":441595,"journal":{"name":"BRIСS Transport","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"BRIСS Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46684/2023.1.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents a methodology for construction engineering management of railway station redevelopment. The station working capacity is taken into account and the stages of preliminary and main works are determined. The scope of work to be performed by a building contractor is substantiated to provide an optimal station performance. The volume and scopes of work for specific and complex construction workflows are grouped by the components of the railway marshalling yard.The optimal volume of work of the complex flow F has been determined (as a percentage of the total estimated cost of the facility). The station working capacity Nв has been taken into consideration in correlation with the given conditions of construction or renovation works.The key construction flow management options have been worked out based on the optimal index of construction work sequence, prime cost reduction of construction and installation works (current costs C), and effective capital investments into machines and mechanisms (one-time costs Кf).The proposed methodology for construction management and engineering solutions is oriented to general contracting and subcontracting companies of the railway construction sector. This methodology is intended to lower the prime cost of construction and installation works and to reduce the time of construction and redevelopment of railway stations.
铁路车站开发的管理和工程解决方案
本文提出了一种铁路车站改造的建设工程管理方法。考虑到车站的工作能力,确定了前期和主要工程的阶段。建筑承建商的工作范围已被证实可提供最佳的车站服务。具体和复杂的施工工作流程的工作量和范围按铁路编组站的组成部分分组。已经确定了复杂流程F的最佳工作量(占设备总估计成本的百分比)。车站的工作能力n22已考虑到相关的给定条件的建设或改造工程。基于施工工作顺序的最优指标,建筑和安装工程的主要成本降低(当前成本C),以及对机器和机制的有效资本投资(一次性成本Кf),制定了关键的施工流程管理方案。拟议的施工管理和工程解决方案方法面向铁路建设部门的总承包和分包公司。这种方法的目的是降低建筑和安装工程的主要成本,减少火车站的建设和重建时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信