Supply crisis parts commodities management during unplanned FAB shutdown recovery

Hoon Kang, Salvin Macwan, Wes Van Erp, Josephine Quek, Bastiaan Saris, Gary R. Huffman, S. Rogers
{"title":"Supply crisis parts commodities management during unplanned FAB shutdown recovery","authors":"Hoon Kang, Salvin Macwan, Wes Van Erp, Josephine Quek, Bastiaan Saris, Gary R. Huffman, S. Rogers","doi":"10.1109/asmc54647.2022.9792485","DOIUrl":null,"url":null,"abstract":"Supplier management swift strategy development and its deployment, specifically focused on semiconductor commodities parts management will be needed to overcome the unplanned FAB manufacturing facility shutdown. The mechanism development and application on the parts commodities management within procurement organization will be the key enabler for the accelerated unplanned FAB manufacturing facility shutdown recovery. Crisis driving the unplanned FAB shutdown includes natural catastrophic events resulting in power failure, system failure supporting manufacturing facility operations and supply chain crisis. Paper further expands on efficient agile mechanism logic and its application deployed to enable the accelerated recovery of the FAB manufacturing facility in the pre-determined amount of time in order to minimize the revenue impact.","PeriodicalId":436890,"journal":{"name":"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","volume":"101 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/asmc54647.2022.9792485","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Supplier management swift strategy development and its deployment, specifically focused on semiconductor commodities parts management will be needed to overcome the unplanned FAB manufacturing facility shutdown. The mechanism development and application on the parts commodities management within procurement organization will be the key enabler for the accelerated unplanned FAB manufacturing facility shutdown recovery. Crisis driving the unplanned FAB shutdown includes natural catastrophic events resulting in power failure, system failure supporting manufacturing facility operations and supply chain crisis. Paper further expands on efficient agile mechanism logic and its application deployed to enable the accelerated recovery of the FAB manufacturing facility in the pre-determined amount of time in order to minimize the revenue impact.
工厂计划外停机恢复期间的供应危机部件管理
供应商管理的快速战略开发及其部署,特别是专注于半导体商品零件管理,将需要克服FAB制造设施意外关闭的问题。采购组织内部零部件商品管理机制的开发和应用将是加速FAB工厂计划外停产恢复的关键因素。导致FAB意外停工的危机包括导致电力故障的自然灾难性事件、支持制造设施运营的系统故障和供应链危机。论文进一步扩展了高效敏捷机制逻辑和应用部署,使FAB制造设施在预定的时间内加速恢复,以尽量减少收入影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信