Hoon Kang, Salvin Macwan, Wes Van Erp, Josephine Quek, Bastiaan Saris, Gary R. Huffman, S. Rogers
{"title":"Supply crisis parts commodities management during unplanned FAB shutdown recovery","authors":"Hoon Kang, Salvin Macwan, Wes Van Erp, Josephine Quek, Bastiaan Saris, Gary R. Huffman, S. Rogers","doi":"10.1109/asmc54647.2022.9792485","DOIUrl":null,"url":null,"abstract":"Supplier management swift strategy development and its deployment, specifically focused on semiconductor commodities parts management will be needed to overcome the unplanned FAB manufacturing facility shutdown. The mechanism development and application on the parts commodities management within procurement organization will be the key enabler for the accelerated unplanned FAB manufacturing facility shutdown recovery. Crisis driving the unplanned FAB shutdown includes natural catastrophic events resulting in power failure, system failure supporting manufacturing facility operations and supply chain crisis. Paper further expands on efficient agile mechanism logic and its application deployed to enable the accelerated recovery of the FAB manufacturing facility in the pre-determined amount of time in order to minimize the revenue impact.","PeriodicalId":436890,"journal":{"name":"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","volume":"101 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/asmc54647.2022.9792485","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Supplier management swift strategy development and its deployment, specifically focused on semiconductor commodities parts management will be needed to overcome the unplanned FAB manufacturing facility shutdown. The mechanism development and application on the parts commodities management within procurement organization will be the key enabler for the accelerated unplanned FAB manufacturing facility shutdown recovery. Crisis driving the unplanned FAB shutdown includes natural catastrophic events resulting in power failure, system failure supporting manufacturing facility operations and supply chain crisis. Paper further expands on efficient agile mechanism logic and its application deployed to enable the accelerated recovery of the FAB manufacturing facility in the pre-determined amount of time in order to minimize the revenue impact.